Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: r] Check this box if tank gauging is used only for Inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. RLGEIVED <br />Complete the following checklist: <br />C Yes <br />(' No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />C Yes <br />r No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? OCT 16 2) <br />(' Yes <br />(` No* <br />Was accuracy of system product level readings tested? <br />i Yes <br />(' No* <br />Was accuracy of system water level readings tested? ENVIRONME <br />(' Yes <br />(' No* <br />Were all probes reinstalled properly? f -!FA! TM !)F IM <br />�+ Yes <br />(� No* <br />ere all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): r Check this box if LLDs are not installed. <br />Complete the following checklist: <br />(+ Yes <br />No* <br />For equipment start-up or annual equipment certificatio,n...r. was a leak simulated to verify LLD performance? (Check all that <br />(� N/A <br />apply) Simulated leak rate:ri 3 g.p.h.; 170.1 g.p.h; l : 0.2 g.p.h. <br />r Yes <br />(' No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />(• Yes <br />(' No* <br />Was the testing apparatus properly calibrated? <br />(+ Yes <br />r No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />(' N/A <br />C Yes <br />C No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />(� N/A <br />i Yes <br />i No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />r N/A <br />monitoring system is disabled or disconnected? <br />(' Yes <br />(' No* <br />For electronic LLDs that are programmed for positive shut down, does the turbine automatically shut off if any portion of the <br />r. N/A <br />monitoring system malfunctions or fails a test? <br />(' Yes <br />i No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />(+ N/A <br />(*- Yes <br />(' No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Page 3 of 3 12/07 <br />15 <br />MAL <br />AAFNT <br />