My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1250
>
2900 - Site Mitigation Program
>
PR0521881
>
WORK PLANS CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 12:41:22 PM
Creation date
8/5/2019 10:55:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0521881
PE
2960
FACILITY_ID
FA0014865
FACILITY_NAME
CALIFORNIA NATURAL PRODUCTS
STREET_NUMBER
1250
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19804001
CURRENT_STATUS
01
SITE_LOCATION
1250 E LATHROP RD
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K L E I N F E L D E R <br /> 4 BACKGROUND <br /> ' 4.1. PROCESS DESCRIPTION OF FORMER OPERATIONS <br /> The following information was obtained from a report dated September 18, 2001 titled <br /> ' "Additional Information For The Report Of Waste Discharge" by Bonneau Dickson of Berkley, <br /> California. <br /> ' Potable water for the California Natural Products (CNP) plant is obtained from the City of <br /> Lathrop water system. The CNP plant uses the water in the manufacturing of the following: <br /> ' ♦ rice milk ♦ soy milk <br /> ♦ flavored teas ♦ cream soups <br /> ' Wastewater is generated throughout the plant primarily from wet mill maceration of vegetables, <br /> surface spillage, clean in place solution, and evaporates. The wastewater is collected and pretreated <br /> by screening, pH adjustment, dissolved air flotation, biological treatment (trickling filter), <br /> coagulation and flocculation in the lamella separator. Wastewater is pumped to the Manteca <br /> Wastewater Treatment Plant, hauled offsite,or discharged to the land. <br /> 4.2. REVISED MONITORING& REPORTING PROGRAM <br /> ' On March 13, 2001, the RWQCB issued a letter to California Natural Products. The letter <br /> detailed requirements for further investigation, technical reports and monitoring. Attached to the <br /> letter was Revised Monitoring and Reporting Program No. 98-223. The RWQCB has further <br /> delayed a hearing regarding the adoption of new Waste Discharge Requirements for the facility. <br /> ' One of the requirements detailed in the RWQCB letter is this workplan which is due on May 10, <br /> 2001. <br /> 20-4587-01.WPI/201 IP128 Page of 12 <br /> Copyright 2001,Kleinfelder, Inc. May 8,2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.