My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
COMPLIANCE INFO 2010 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 4:52:21 PM
Creation date
8/19/2019 4:16:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2013
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 09 13 O1:O2p Elite IV Contactors 12094616342 <br />MSZ BLM-xx <br />Page 2 <br />Step 7: Install The Eccentric Insert & Multi -Sync Reducer <br />• Dry fit the Eccentric insert. Make sure it fits properly over the pipe & inside the <br />sleeve. <br />• Dry fit the Multi -Sync Reducer <br />• Adjust the positions so that they lineup properly with the Repair Sleeve & Pipe. <br />Note: A proper fit will not cause extra pressure or force to the sleeve and will <br />allow a longer lasting repair. <br />• Once you have the part lined up correctly <br />1. Pull back the Multi -Sync Reducer & Eccentric Insert <br />2. Apply Zip-Tite bonder all around the Eccentric Insert, <br />3. Slide Eccentric into the Repair sleeve in the proper position <br />4. Apply Zip-Tite bonder all around the Multi -Sync Reducer <br />5. Slide the Multi -Sync Reducer into it's proper place <br />6. Set the Clamp the around the sleeve & over the Eccentric Insert and tighten <br />"snugly". <br />7. Set clamp over reducer end on the pipe & tighten enough to create a seal <br />around the pipe. <br />w <br />12V <br />50 MM Pipe XXX2,0 <br />MSZ BLM-2.0 <br />UIZ BLM 5.1x2.0 <br />VIZ 6.Dx4.5E <br />2' FRP XXX2.5 <br />MSZ 131.10-2.4 <br />UIZ BLM 5.1x2.4 <br />UIZ 6.0x4.5E <br />63 MM Pipe XXX2.5 <br />MSZ BLM-2.5 <br />UIZ BLM 5.1.2.5 <br />UIZ6.00,512 <br />2" LCX XXX 2.7 <br />MSZ BLM-2.7 <br />UIZ BLM 5.1x2.7 <br />UIZ 6.Ox4.5E <br />7510m Pipe XXX3.0 <br />MSZ BLM-3.0 <br />UIZ BLM 5.1x3.0 <br />UIZ 6.0x3.0 <br />3" FRP & 90 MM Pipe XXX3.5 <br />MSZ BLM-3.6 <br />UIZ BLM 5.10.6 <br />Ur2 6.0x3.6 <br />3" FRP over 2" FRP XXX3.5x2.4 <br />MSZ BLM-3.6 <br />UR BLM 5.1x3.6 <br />UIZ 6.0x3.6 <br />3" LCX XXX3.7 <br />MSZ 81.110-3.8 <br />VIZ BLM 5.1x3.8 <br />UIZ 6.0x3.8 <br />Corrugated Ducting over 11/2" Flax XXX4.8x2.0 <br />MSZ BLM-4.6x2.0 <br />UIZ BLM 5.1x2.0 <br />UIZ 6.Ox4.5E <br />Corrugated Ducting over 11/2" Flax XXX4.8x2.5 <br />MSZ BLKI-4.6x2.5 <br />UIZ BLM S.1xZ.5 <br />UIZ 6.0x4.5E <br />Step 9: Fill With DBF II, Insert Fill Plug <br />• Assemble DAG & DBF II (see instructions on DPM website). <br />• Purge 1-2 oz. <br />• Fill fitting slowly. <br />Note: Use Remote Fill option if access Is limited <br />• Insert fill plug when filling is completed. <br />• Clean any spilled DBF II with DBC and dispose <br />of remaining products per local requ <br />Note: After 1 hour <br />the repair job may be <br />hydro -static tested <br />TOOLS REQUIRED: <br />p.6 <br />bu� - 3, (_0 <br />QC(�,Cw& 26T 2. <br />{{ :K;r. 'yxi J.I � � St,t^:rG•,-., inld,. ° ..--•s. p� 1.. .�.5i.i .:` -`. i <br />s <br />IIR OS 4.5x2.0 <br />UR �!S 4.5x2.4 <br />1113 4 S 4.5x2.5 <br />IIR e'54.5x2.7 <br />J A <br />_ IJ/A <br />_ <br />j4/A <br />IIR: uIS 4.5x2.0 <br />IIR. "Is 4.5x2.5 <br />Gloves and Static Mixe• <br />5/16" Nut driver (for Band Clamps) <br />DAG Caulk Gun (for DBF II) <br />DAGP Caulk Gun (Pneumatic version for DBF II j <br />PRODUCTS NEEDED: Each DBF It & DBB V come <br />DBC Cleaner with a Static Mixer <br />DBB III Bonde. <br />DBF II Polysl-I fi I! Liquid Fill <br />FILLVolume: (perrepaii Iiclotl <br />Volume of DBF II neede - See Table above <br />Volume of DBB III neece - - 2 oz per part <br />Remote Fill Option: <br />Parts in kit: <br />The following parts are available to order if you can not <br />Bonding Ring <br />properly position the assembled DBF II applicator gun to <br />Sleeve <br />"fill" the repair. The Remote Fill parts provide a flexible <br />Eccentric Insert <br />extension for the filling process. <br />Multi -Sync Reducer <br />RF Adapter 24" tube with male & female ends <br />5 clamps <br />RFA Tube -24 YZ" Tubing in 24" lengths <br />Fill Port Plug <br />Install Instructions <br />RFA Tube Y=" Tubing in 20D' length roll <br />RFA TubexTube Y2" Tube Coupling <br />RFA xFemale Ya" Tube -Female Fill Port end <br />RFAxMale Y2"Tube-Male Fill Port end <br />RFA xPlug Y:" Tube -Male Plug for fill port <br />UIZ MS 6.0x5.7 CR <br />USZ G.OxG.0 <br />UIZ 6.OxSeeTable <br />URZ MS 4.5xSee Table <br />3 #96, 1 #90, 1 # See Table <br />RFA xPlug <br />
The URL can be used to link to this page
Your browser does not support the video tag.