Laserfiche WebLink
Mai 09 13 01:02p <br />Elite IV Contactors <br />12094616342 <br />MSZ BLS-xx <br />Page 2 <br />Step 7: Install The Eccentric Insert & Multi -Sync Reducer <br />• Dry fit the Eccentric insert. Make sure it fits properly over the pipe & inside the <br />sleeve, <br />1. Apply Zip Tite bonder all around the Eccentric insert, <br />2. Slide Eccentric into the Repair sleeve in the proper position <br />3. Set the Clamp the around the sleeve & over the Eccentric Insert and tighten <br />"snugly". <br />U• I r l\ ..r ��0 <br />p.7 <br />l - du�si& <br />PI.5- <br />Rap -K4 <br />Culf Im"I <br />EaeM6k7lnut <br />3" FRP 890 MM. 3.5 <br />MSZ BLL -3.6 <br />UIZ BLL 6.9x3.6 <br />UIZ 6.7x5.0E LI <br />4' over 3" FRP •45.3.5 <br />SZ BLL 4.5 <br />UIZ BLL 6.9x4.5 <br />UIZ 6.7x4.5 Nr <br />4'LCX •9.8 <br />nSZ BLL -4.8 <br />UIZ BLL 6.9x4.8 <br />UIZ 6.7x4.8 N� <br />4"Corngated D.M.9-111/2"FIe.•4.8x2.0 <br />SZ BLL -4,6x2.0 <br />UIZ BLL 6.9x1.0 <br />1 6.74,0E LI <br />4' Corrugated Ductatg ova, 2"Flex-4.&2.5 <br />MSZ BLL4.6x2.5 <br />UIZ BLL 6.9x2.5 <br />UIZ 6.7,5.0E UI <br />4'Cwrugated Ducting over 3.0 pip, -4.8.3.0 <br />MSZ BLL4.6x3.0 <br />UIZ BLL 6.90.0 <br />UIZ 6.7.5.0E ul <br />Step 9: Fill With DBF Il, Insert Fill Plug <br />• Assemble DAG & DBF II (see instructions on DPM website). <br />• Purge 1-2 oz . <br />• Fill fitting slowly. <br />Note: Use Remote Fill option if access is limited <br />• Insert fill plug when filling is completed. <br />• Clean any spilled DBF II with DBC and dispose <br />of remaining products per local requirements. <br />Note: After 1 hour <br />the repair job may be <br />hydro -static tested <br />Remote Fill Option: <br />The following parts are available to order if you can not <br />properly position the assembled DBF II applicator gun to <br />"fill" the repair. The Remote Fill parts provide a flexible <br />extension for the filling process. <br />RF Adapter 24" tube with male & female ends <br />RFA Tube -24 Y2" Tubing in 24" lengths <br />RFA Tube Y2" Tubing in 200' length roll <br />RFA TubexTube Y2" Tube Coupling <br />RFA xFemaie Y2" Tube -Female Fill Port end <br />RFA xMale Y2" Tube -Male Fill Port end <br />RFA xPlug Y2" Tube -Male Plug for fill port <br />TOW REQUIRED: <br />Gloves and Static Mixer <br />5/16" Nut driver <br />DAG Caulk Gun <br />DAGP Caulk Gun <br />DAG III Caulk Gun <br />PRODUCTS NEED <br />DBC <br />Mr <br />08F 11 Fill Clam <br />Z -..0x3.6 <br />60 <br />.. <br />72 <br />1 <br />80 <br />ZI '•.0.2.0 <br />32 <br />40 <br />Ll 6.0.3.0 <br />46 <br />DBC <br />Cleaner <br />DBB 111 <br />Bonder <br />DBF 11 <br />Polysulfi IE <br />DBB V <br />Bonder I;'c <br />(far Band Clamps) <br />(for DBF II) <br />(;Pneumatic version for DBF II ) <br />(for DBB V) <br />Each DBF II & DBB V come <br />Liquid Fill with a Static Mixer <br />"oly or Fiberglass sumps) <br />FILLVolume: (per revail F tot <br />Volume of DBF II neede I <br />Volume of DBB III needed = <br />Volume of DBB V needed = <br />Parts in kit: <br />Cuff Insert <br />Sleeve <br />Eccentric Insert <br />Multi -Sync Reducer <br />4 clamps <br />Fill Port Plug <br />Install Instructions <br />UIZ BLS 3.1xSee Table <br />USZ 3.5x3,5 <br />UIZ 3.5xSee Table <br />URZ MS 2.6xSee Table <br />1 #120, 1 #116, 1 #104, 1 # See Table <br />RFA xPlug <br />