Laserfiche WebLink
used, be sure a dedicated, grounded outlet is local codes, since they pass from a Class I, <br /> used. Conduit must enter controller where Division 1 area into a non-hazardous area. <br /> prepunched conduit holes are provided. WARNING: Explosion may occur if other <br /> C. Dig trenches as necessary, and install conduit wires share the X76 ETM's probe wire con- <br /> from the controller to each probe location. duit. Conduit from probes to controller must <br /> Probe wire must enter controller through the not contain any other wires. <br /> proper prepunched conduit holes. <br /> D. The conduit can enter the probe manhole <br /> through the bottom or side. The end of the <br /> conduit should be as high as possible to 4.0 COMPONENT INSTALLATION <br /> reduce the chance of water covering the junc- <br /> tion box during heavy rain. <br /> WARNING: The installation and use of this <br /> E. Lay 3/4" rigid metal conduit from each probe product must comply with the National Electrical <br /> to a junction box or wiring trough, located in- Code,federal, state and local codes, and any <br /> side the building. Conduit must enter control- other applicable safety codes. In addition, take <br /> ler where prepunched conduit holes are the necessary precautions during installation,ser- <br /> provided. No other conduit entry is permitted. vice and repair to prevent personal injury, proper- <br /> WARNING: Explosion may occur if other ty loss and equipment damage. <br /> wires share the X76 ETM's probe wire con- WARNING:Turn off power to the system before <br /> duit. Conduit from probes to controller must opening the front panels to avoid shock from the <br /> not contain any other wires. power supply. In addition, power to the system <br /> WARNING: Explosion and equipment damage must be turned off before opening or securing the <br /> may occur if conduits do not enter the con- barrier cover. If high voltage is shorted across <br /> troller through their designated prepunched any barrier probe terminal, explosion or fire could <br /> conduit holes. result. <br /> Failure to comply with these warnings could 4.1 Controller Installation <br /> result in serious personal injury, property loss <br /> and equipment damage. Mounting: Select a mounting location on the in- <br /> Wiring between the probes and the controller is <br /> side wall of an enclosed building, protected from <br /> severe vibration and extreme temperature. The <br /> designed with limited electrical power to probe monitor should be mounted with the LCD at eye <br /> wires so there is insufficient energy to ignite fuel. level. <br /> To maintain this safety feature. probe wires must <br /> be installed in a separate conduit from all other Wiring: <br /> wiring. Probe wires MUST NOT be run in same A. Open controller cover, remove the screws <br /> conduit as power wires. holding the barrier plate and remove the plate. <br /> 3.4 Probe Junction Box And Vapor B. Locate the input power terminal on the left <br /> Seal Installation edge of the board between the top and bottom <br /> edge of the board. See controller wiring con- <br /> Install a vapor seal at both ends of the conduit. nection diagram on page 16. Connect the <br /> One end must be at the probe end of the conduit wires from the breaker box to the controller, in- <br /> and the other end before the the conduit enters cluding the earth ground. <br /> the building. Install a weatherproof electrical junc- <br /> tion box with a gasketed cover at the end of each GROUND LEM SAN O1E <br /> conduit at the probe location. .ROBE WIRE SCAM GRIP <br /> CAM GRA <br /> 3.5 Probe Wiring CAP <br /> 0 ) ` �'—ADAPTOR <br /> Pull the twisted pair shielded cable. #22 AWG or EYE NOOK r .•..E <br /> heavier, between the controller and each probe $.CK CNAN <br /> location. The wires must be designed for use in "WATERPROOF" <br /> JUNCTION 80 <br /> the presence of gasoline and/or oil, and the con- (SEEDETAILI <br /> duit must be sealed in accordance with the Na- <br /> tional Electrical Code, (NFPA 70), and meet the -� N^TMREAOW <br /> TANK CUSNYIG <br /> specification pertaining to the product being OPTIONAL <br /> monitored as defined by Flammable and Com- PROSE HOUSING <br /> r ,ANN <br /> bustible Liquids Code, (NFPA 30), and other <br /> Figure 4-1:X76 ETM Installation. <br /> 5 <br />