My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4315
>
2300 - Underground Storage Tank Program
>
PR0231760
>
INSTALL 1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2019 4:40:15 PM
Creation date
8/23/2019 3:54:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1992
RECORD_ID
PR0231760
PE
2351
FACILITY_ID
FA0003831
FACILITY_NAME
WATERLOO FOODMART
STREET_NUMBER
4315
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215-2305
APN
08710034
CURRENT_STATUS
01
SITE_LOCATION
4315 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Tank Number <br /> Tank Tilt Information <br /> 1 2 3 4 5 6 7 8 <br /> A. Fuel height at fill riser. <br /> B. Fuel height at probe riser. <br /> i <br /> C. Distance between fill and probe riser. <br /> D. Distance of probe from center of tank. <br /> Note: If A and B are equal, tank tilt equals 0. <br /> Table 4-1:Tank Tilt Information. <br /> C. Locate the probe input terminal on the bottom C. Using a dip-stick, measure fuel height at the <br /> edge of the board and connect probe wiring probe riser and fill riser. Enter the readings on <br /> according to color code designations on con- Table 4-1: Tank Tilt Information. IMPOR- <br /> troller wiring connection diagram. TANT: If readings are different, a tank tilt is in- <br /> 4.2 Probe installation Refer to Installation in- <br /> dicated. This information is needed at set-up <br /> time. Be sure to take reading before the probe <br /> Diagrams on pages 16 and17) is installed. <br /> Important: Each probe is identified by its Speed Note: For the most accurate X76 ETM perfor- <br /> of Wire and Rep. Rate numbers. These two num- mance, use the center tank opening for the <br /> bers must be entered into the controller for (num- probe riser. Any difference in the fuel height at <br /> ber of the individual tank) the probe is to monitor. the fill riser and probe riser indicates a tank tilt <br /> The Speed of Wire and Rep. Rate are listed on and the following steps should be taken immedi- <br /> the permanent label under the probe cap and ately for ease at set-up time. <br /> also on the yellow tag attached to the top of the Measure the distance between fill riser and <br /> probe. When the probe is installed into the tank, probe riser. as well as the distance from the <br /> record the Tank Number and the probe's correct <br /> Speed of Wire and Rep. Rate. <br /> Check the tank diameter, and fill pipe height to RISER ILL^ C-- RISER <br /> PROBE <br /> be sure the correct size probe has been ordered <br /> and there is clearance from the top of the probe <br /> to the fill pipe cap. <br /> WARNING:To prevent personal injury, <br /> property loss and equipment damage,take <br /> necessary precautions to ensure that <br /> vehicles do not enter work area. B <br /> A <br /> A. Measure the distance from the bottom of the TANK <br /> tank to the top of the riser pipe. (B). Be sure <br /> there is clearance between the top of the - <br /> probe and riser pipe cap. See Figure 4-2: <br /> Tank Dimensions <br /> B. Measure the distance from the bottom of the <br /> tank to the bottom of the fill pipe. Add a mini- Tank Dim. "A" Dim. "B" Dim."C" <br /> mum of 1" to this distance. Loosen the two set Dia Min. <br /> screws on the spacer ring and adjust the dis- 6' 92.62" 95.59" 4.0 Dia. <br /> tance from the bottom of the probe. It should <br /> be equal to or greater than the distance 8' 116.62" 119.50" 4.0 Dia. <br /> measured above. This will ensure that the 10, 140.62" 143.50 4.0 Dia. <br /> spacer ring will be located in the probe riser <br /> pipe when the probe is installed. <br /> Figure 4-2:Tank Dimensions. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.