My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2900 - Site Mitigation Program
>
PR0505733
>
SITE INFORMATION AND CORRESPONDENCE CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:51 AM
Creation date
9/3/2019 2:30:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
CASE 1
RECORD_ID
PR0505733
PE
2950
FACILITY_ID
FA0006970
FACILITY_NAME
TOSCO #787
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
02
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN GEO-ENGINEERS <br /> Certified lab resiUlts, to date show that all the contaminated soil <br /> was removed during the initial tank pull and that the water <br /> contamination seems to be limited to the area of the excavation <br /> and monitor well #1. <br /> You then stated you would draft a letter and send it to Diane <br /> Hanson on Monday (May .23, 1988) to give your OK to continue <br /> construction. You did not at that time indicate that you needed <br /> more information from me, but would appreciate the site assessment <br /> report as soon as possible. (In fact, it was my understanding <br /> that you did not want ANYTHING prior toy the final draft of the <br /> Preliminary Site Assement. ) <br /> I have enclosed a packett of figures and tables that was presented <br /> to Diane Hanson during our meeting May 23, 1988. I am also <br /> enclosing a letter sent to John Rutherford which details your <br /> "far. " document. <br /> As stated during our phone conversation and again in the letter to <br /> John, I anticipated submittal of the assessment report with <br /> recommendations by mid June. I will be taking another water <br /> sample set, June 1, 1988, for rush turn around lab analysis, so <br /> this can also be included in the assessment report. <br /> If you have any questions and comments please let me know. <br /> Sincerely, <br /> George L. Converse <br /> SNCL: <br /> cc: John Rutherford <br /> Peter Allen a <br /> Diane Hanson <br /> GLC/lm <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.