Laserfiche WebLink
T � / <br /> period of time the tanks were in service. The site had been a welding supply <br /> warehouse for many years; a small portion of the building is still used for that <br /> purpose. The rest is leased for use as an automotive body repair shop. <br /> BRIEF REVIEW OF PRIOR WORK: <br /> June 12, 1986 - Two 550 gallon UST's were removed from the property by Seibold, <br /> Inc. The owners have no information concerning the disposition of the tanks by the <br /> contractor, or what was done with the removed spoil. <br /> August 28, 1986 - Two (2) soil samples were taken from the site of the removed <br /> UST's by an employee of Canonie Environmental. It is assumed that the excavation <br /> was filled after this work was performed. <br /> September 19, 1995 - The site of the removed UST's was reentered using Jim <br /> Thorpe Oil, Inc. equipment and personel under the direction of Wm. Hunter, RG from <br /> Wm. J. Hunter & Associates. Approximately 130 cubic yards of contaminated soil was <br /> excavated; it was disposed of at a licensed land fill. The REHS representative from <br /> the San Joaquin Co. EHD directed that soil & water samples were not needed at that <br /> time, since additional work would be required. The excavation was filled with pea <br /> gravel and covered with asphalt. For more details of that work, refer to Wm. J. Hunter <br /> & Associates (WJH) report titled "Interim Assessment Report Covering Results of Soil <br /> Excavation Work & Work plan for Soil & Groundwater Investigation'; dated February <br /> 8, 1996. TABLE I summarizes the results of the lab analyses from the spoil pile <br /> samples. <br /> July 25, 1996 - Eight (8) shallow geoprobe holes were placed on the property in an <br /> attempt to define the lateral limits of soil and groundwater contamination. The details <br /> of that work is covered in the Wm. J. Hunter & Associates report titled "Interim <br /> Assessment Report Covering Results of Soil & Groundwater Investigation..." dated <br /> August 26, 1996. The locations of those probe holes are shown on PLATE III. The <br /> lithologic plots are included as PLATES VIIIA - VIIIH. The laboratory results of soil <br /> and water samples taken during that work are summarized on TABLES 11 & III. <br /> October 4 1996 - Three (3) 2" monitoring wells were placed on the property under the <br /> direction of Wm. J. Hunter & Associates. They were drilled to 20' bgl, and screened <br /> from bottom to 5' below grade. The details of that work is covered in the Wm. J. <br /> Hunter & Associates report titled `Interim Assessment Report Covering Results of Soil <br /> & Groundwater Investigation" dated November 12, 1996. The locations of the three <br /> wells is shown on PLATES III & IV. Copies of the lithologic plots and completion <br /> diagrams are shown on PLATES IXA - IXF. The results of the laboratory analyses of <br /> soil samples from that work are summarized on TABLE IV. <br /> 3 <br />