Laserfiche WebLink
y <br /> (3) A landfill gas control or recovery system would be installed. <br /> (4) Gas accumulations in on-site buildings or beneath temporary buildings shall be <br /> prevented by regular monitoring. <br /> (5) The landfill operator shall install an automatic combustible gas detection and alarm <br /> system for structures at the site. <br /> (6) The landfill operator shall install an automatic combustible gas detection and alarm <br /> system for structures at the site. <br /> (7) The landfill operator shall not construct or otherwise locate any structure in an area of <br /> known landfill gas buildup. <br /> I <br /> (8) All site personnel who work in structures shall be trained to use and respond to <br /> landfill gas monitoring and alarm systems. <br /> (9) The proposed landfill gas control system would include a series of gas extraction <br /> wells and connectors, a gas condensate collection system, and a gas blower/flare. <br /> i <br /> The installation of a flare would require participation in the AS-2588 Air Toxics"Hot Health and Safety Code . <br /> Spots" Information and Assessment <br /> Act under California <br /> Section 44325. The flare will not be required if the landfill gas is recovered <br /> for <br /> Impact <br /> electric power generation or other energy use (see Final SEIR 3 and <br /> LA,` and Mitigation). <br /> h. NOISE: To reduce impacts from noise, the followings measures shall be incorporated <br /> into the project: <br /> (1) The proposed project must conform to the San Joaquin County Noise Standards <br /> contained in the County's General Plan and Development Title. The project sponsor <br /> d to demonstrate compliance with this performance standard. Work <br /> shall be require uled noise <br /> areas could be limited, work times close to a residence could be rescheduled, <br /> barriers such as earth berms could be designed, and noise monitoring shall be <br /> undertaken to demonstrate compliance in the event noise complaints are received. <br /> (2) if project related noise levels, measured at the property line of any residential use, <br /> would exceed an hourly average of 45 dBA during the nighttime or 55 dBA during the <br />' daytime, then setbacks and a limitation on hours of operation shat[ be mandatory. As <br />{ recommended in the Forward Inc. Landfill Use Permit Modifications, the option of a <br /> soundwall at 9690 Austin Road shall be available to the resident(see Final SEIR H1, <br /> Impact and Mitigation). <br /> i. ODOR: To reduce odor impacts from landfill wastes, the following measures shall be <br /> implemented: <br /> (1) The project includes the design and implementation of a landfill gas recovery or <br /> control system to ensure efficient destruction of odoriferous substances. <br /> (2) Excessively odorous wastes shall be mixed immediately with other landfill wastes, <br /> depending on their nature and source. If diluting the intensity of odor is not sufficient, <br /> then the operator shall immediately cover offensive materials as soon as they arrive <br /> at the landfill. <br /> (3) The operator shall ensure that loading, unloading, and material handling activities are <br /> carried out efficiently and without delays to avoid excessive odors. <br />