Laserfiche WebLink
c f' <br /> I <br /> E (3) As required by California Code of Regulation,17258-10(b), Airport Safety, the owner <br /> or operators proposing to site new MSWF units and lateral expansions within a five- <br /> mile radius of any airport runway end used by turbojet or piston-type aircraft must <br /> notify the affected airport and the at of a AA. Th demonstration. of Mitigation Measures(a)and <br /> (c)will be written in the f <br /> (4) As required by California Code of Regulation 17258.10(c), Airport Safety, the owner <br /> or operator must place the demonstration in the operating record and notify the <br /> CIWMB that it has been placed in the operating record. <br /> o. LIGHT AND GLARE: To reduce impacts from lighting and glare, the following measures <br /> shall be implemented: <br /> (1) The use of highly reflective surface materials in constructing structures on the site <br /> shall be restricted. Exterior building materials shall be painted or otherwise treated <br /> with muted earth tone colors. <br /> (2) At any time in the development of the expanded landfill when additional lighting is <br /> proposed, preliminary lighting designs should be sent to the Northern California <br /> Women's Facility for review and comments. <br /> (3) The Stockton Airport management shall be provided with project lighting plans for <br /> review and comment. Modifications to the lighting plan shall be made as necessary <br /> to avoid conflicts with airport operations (see Final SEIR B.3, Impact and Mitigation). <br /> p. ACCESS AND CIRCULATION: The main access road shall be paved. Unpaved <br /> roadways and other disturbed unvegetated areas of the site (not including the active area <br /> of the landfill)would be sprayed with water and dust-suppressing chemicals for dust <br /> control, as necessary. Also, please refer to Mitigation Measure GA regarding dust(see <br /> Final EIR B.5, Impact and Mitigation). <br /> ul <br /> q. The Landfill hall not accept solid waste for flows identified inisposal from ntheiSupplementaal EIR. <br /> public self <br /> customers and shall be limited to the traffic <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Gabe Karam, 468-3000) <br /> a., An encroachment permit shall be required for work within the road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> E <br /> b. No excavation will be allowed within 25 feet of any road right-of-way line. (Developmen <br /> Title Section 9-1415.301)• <br /> tt <br /> c. All grading shall remain a minimum of c5eektisfrom <br /> sa accepted by the Stateng Rec�almationJohns <br /> a <br /> Creek until the realigned portion of t <br /> Board. (Flood Control Division) <br /> " d. A copy of the Final Site Plan shall be submitted. <br /> e. The Traffic impact additional <br /> Fare end generated uired inrthis development. The fee the Manteca area. The fee hall be <br /> is$164.32 per additiana y p <br /> I automatically adjusted July I of each year News Record. (Resolution the Engineer' Construction Cost Index as <br /> published by the Engineering <br /> 1 <br />