Laserfiche WebLink
A <br /> Facts in Support of the Finding: <br /> The potential for decreased level of service at the Austin Road/Mariposa Road intersection is <br /> discussed in Section 1IL1)of the EIR. The Austin Road Landfill Expansion Project is not fully <br /> responsible for the need for a signal at this intersection,but will add more traffic to an already <br /> congested intersection. Therefore,a fair share attributable to the landfill is calculated in the EIR. <br /> b. Cumulative Impact on Level of Service at Austin Road/Mariposa Road Intersection <br /> Potential Significant Impact(D.2): <br /> The project would contribute to the cumulatively significant deterioration of level of service at <br /> E the Austin Road/Mariposa Road intersection. <br /> Finding: , <br /> Based upon the analysis in the EIR, signalizing the Austin Road/Mariposa Road intersection will <br /> 0 make the cumulative decrease in level of service at this intersection less than significant. <br /> j <br /> The following mitigation measure will mitigate these impacts to below a level of significance. <br /> Mitigation Measure (Impact D.2): <br /> Implement Mitigation Measure D.1. This mitigation measure would also mitigate the <br /> project's contribution to cumulative traffic impacts. <br /> �i Facts in Support of the Finding: <br /> The potential for cumulative impacts on the level of service at the Austin Road/Mariposa Road <br /> intersection is discussed in Section 11I.13 of the EIR. Signalizing the intersection would mitigate ; <br /> the project's contribution to cumulative impacts as well as direct project impacts. j <br /> 5. Cultural Resources <br /> i <br /> a.Potential Cultural Deposits <br /> Potential Significant Impact(E.1): <br /> The Austin Road Landfill Expansion area,with the North Branch of South Fork of Little Johns <br /> Creek running through it, is a potential candidate for locating additional and/or disturbing <br /> subsurface cultural deposits. <br /> Finding: <br /> Based upon the analysis in the EIR,if archaeological resources are discovered during project <br /> construction,suspension of work and appropriate investigation and treatment by a qualified <br /> archaeologist will make the potential impact on archaeological resources less than significant. <br /> i <br /> 23 <br />