Laserfiche WebLink
I <br /> The following mitigation-measures will mitigate these impacts to below a level of significance. <br /> Mitigation Measures (Impact K.7): <br /> (a) Maximum preloaded settlement of the existing landfill would provide the maximum <br /> period for settlement, and would take advantage of anticipated improvements in <br /> geosynthetic technology that would occur over the next 35 years. <br /> (b) The final design for the vertical expansion would, if necessary, include additional <br /> components in the liner system, depending on fiture derential settlement on the liner <br /> system. <br /> (c) The extraction.wells developed as part of the CAP shall be maintained and monitored <br /> during Phases V and VI, to be employed as needed for the extraction of any residual <br /> contamination by leachate. <br /> F <br /> �f (d)A review of the liner and leachate collection system for the vertical expansion over <br /> the existing landfill shall be conducted by the appropriate responsible agencies upon <br /> completion of the final design drawings. <br /> i <br /> Facts in Support of the Finding: <br /> i <br /> The potential for contamination from damage to the liner and/or leachate collection system is <br /> discussed in Section IILK of the EIR. The measures above are designed to mitigate possible <br /> water contamination from damage to the liner and/or leachate collection system. <br /> } ,I <br /> g.Potential Cumulative Effects of Leachate on ii Water and Air Quality E <br /> Potential Significant Impact(K 8): <br /> I' Potential seepage of leachate from the landfill expansion would cumulatively affect water quality <br /> if not properly mitigated,and leachate treatment also could affect air quality. i <br /> Finding. <br /> Based upon the analysis in the EIR,Mitigation Measures K.5 and K.6 will also make potential <br /> water contamination due to liner or leachate collection system damage from differential <br /> settlement less than significant. <br /> The following mitigation measures will mitigate these impacts to below a level of significance. <br /> l <br /> Mitigation Measures(Impact K 8): <br /> Implement Mitigation Measures K 5 and K 6. <br /> 47 <br />