Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> • If on-site wetlands, irrigation ditches,marshes, SJCCDD shall require that SJCCDD shall monitor construction <br /> etc. are being relocated in the vicinity:the construction affecting and verify that construction <br /> newly created aquatic habitat shall be created wetlands be conducted as affecting wetlands is conducted as <br /> and filled with water prior to dewatering and specified in the mitigation specified in the mitigation <br /> destroying the pre-existing aquatic habitat.In measure. measure. <br /> addition,non-predatory fish species that exist in <br /> the aquatic habitat and which are to be <br /> relocated shall be scined and transported to the <br /> new aquatic habitat as the old site is dewatered. <br /> F.13. Any construction activities <br /> conducted in or near the North Branch of the South <br /> Fork of Little Johns Creek could result in <br /> significant adverse impacts to western pond turtles. <br /> (a) Prior to initiating any work in the North Branch (a) SJCCDD shall require (a) SJCCDD shall verify that <br /> of the South Fork of Little Johns Creek and that preconstruction surveys preconstruction surveys be <br /> adjacent habitats,pre-construction surveys should be conducted.,CDFG and conducted.,that CDFG and <br /> be conducted within 48 hours prior to de-watering USFWS consulted for USFWS are consulted for guidance <br /> the creek channel. CDFG and USFWS should be guidance prior to prior to translocation of turtles,that <br /> consulted for guidance prior to any western pond translocation of turtles,that detected nests be buffered,and that <br /> turtle translocation work.'Translocation should be detected nests be buffered, all pre-construction and j <br /> conducted at the expense of the SJMSCP JPA and and that all pre-construction construction measures are <br /> with the approvals of USFWS and CDFG. In and construction measures consistent the MSCOSP <br /> addition,a detected nest would require a 300-foot be consistent the MSCOSP <br /> buffer area for the nest and the associated wetlands <br /> while the nest is occupied. The nest site should be <br /> monitored by a qualified biologist until the <br /> hatchlings have left the nest. These buffers shall be <br /> indicated by temporary fencing if construction has <br /> begun or will begin before nesting periods have <br /> ended(the period from egg laying to emergence of <br /> hatchlings is normally April to November) <br />