My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> .Furthermore,any pre-construction and construction <br /> measures should be consistent the SJMSSP. . <br /> F.14. Implementation of the project could <br /> result in significant adverse impacts to greater <br /> western mastiff bat. <br /> (a) Pre-construction surveys for greater western (a)SJCCDD shall require (a) SJCCDD shat l verify that pre- <br /> mastiff bat should be conducted prior to removing that pre-construction surveys construction surveys be conducted <br /> any trees from the project site. These pre- be conducted as specified in as specified in the mitigation <br /> construction surveys may be required and funded the mitigation measure,and measure,and that if western mastiff <br /> by the SJMSCP JPA and should be conducted by a that if western mastiff bats bats are identified,the procedures <br /> biologist with experience surveying for bats,and are identified,the procedures specified in the mitigation measure <br /> the surveys should not occur any more than 30 days specified in the mitigation are followed. <br /> prior to the proposed tree removal. If no special- measure are followed. <br /> status bats are identified during the pre-construction <br /> surVey(s),then no impacts to these bats would be <br /> expected to occur from construction of the proposed <br /> project. If, however, greater western mastiff bat is <br /> identified in any of the trees proposed for removal, <br /> reproductive status should be determined. <br /> (b) Maternity sites should be avoided until bats (b) See(a),above. (b) See (a),above. <br /> finish rearing young. Prior to the bats finishing <br /> rearing their young,bat roosts/maternal"bat <br /> houses" should be placed within a protected area in <br /> the vicinity of the roosting/matemity sites if <br /> possible. As soon as young are flying and foraging, <br /> the maternity sites should be sealed. Similarly, <br /> once bat houses are installed in protected areas,bats. <br /> should be evicted from their roost sites within the <br /> project construction zone(i.e.,should be evicted <br /> from the trees to be removed). Removal of roost <br /> 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.