My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> warranted. <br /> G.7. The project,by incrementally adding <br /> to regional air pollutant emissions,would have a <br /> significant cumulative air quality impact. <br /> See Mitigation Measures G.1 through GA. See implementation See monitoring/reporting <br /> responsibility and responsibility and timing for <br /> timing/schedule for Mitigation Measures G.l through <br /> Mitigation Measures G.1 GA.. <br /> through GA. <br /> H. NOISE <br /> H.1. On-site equipment and activities <br /> would result in an increase in ambient noise levels <br /> at the nearest receptor. <br /> (a) The proposed project must conform to (a)Operator shall design the (a) SJCDD staff shall review all <br /> the San Joaquin County Noise Standards contained expansion project to monitoring reports to ensure <br /> in the County's General Plan. The project sponsor conform to the Noise compliance with the San Joaquin <br /> shall be required to demonstrate compliance with Standards contained in the County Noise Standards contained <br /> this performance standard. Work areas could be County's General Plan. in the County's General Plan. <br /> limited,work times close to the residence could be SJCCDD will document <br /> rescheduled,noise barriers such as earth berms compliance with this <br /> could be designed,and noise monitoring shall be performance standard. In <br /> undertaken to demonstrate compliance in the event : the event noise complaints <br /> noise complaints are received. are received, SJCCDD will <br /> work with the operator to <br /> bring the project into <br /> compliance and conduct <br /> noise monitoring to <br /> demonstrate compliance. <br /> (b) If project-related noise levels,measured (b)LEA shall monitor'the (b)LEA shall review the <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.