Laserfiche WebLink
F <br /> IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> warranted. <br /> G.7. The project,by incrementally adding <br /> to regional air pollutant emissions,would have a <br /> significant cumulative air quality impact. <br /> See Mitigation Measures G.1 through GA. See implementation See monitoring/reporting <br /> responsibility and responsibility and timing for <br /> timing/schedule for Mitigation Measures G.l through <br /> Mitigation Measures G.1 GA.. <br /> through GA. <br /> H. NOISE <br /> H.1. On-site equipment and activities <br /> would result in an increase in ambient noise levels <br /> at the nearest receptor. <br /> (a) The proposed project must conform to (a)Operator shall design the (a) SJCDD staff shall review all <br /> the San Joaquin County Noise Standards contained expansion project to monitoring reports to ensure <br /> in the County's General Plan. The project sponsor conform to the Noise compliance with the San Joaquin <br /> shall be required to demonstrate compliance with Standards contained in the County Noise Standards contained <br /> this performance standard. Work areas could be County's General Plan. in the County's General Plan. <br /> limited,work times close to the residence could be SJCCDD will document <br /> rescheduled,noise barriers such as earth berms compliance with this <br /> could be designed,and noise monitoring shall be performance standard. In <br /> undertaken to demonstrate compliance in the event : the event noise complaints <br /> noise complaints are received. are received, SJCCDD will <br /> work with the operator to <br /> bring the project into <br /> compliance and conduct <br /> noise monitoring to <br /> demonstrate compliance. <br /> (b) If project-related noise levels,measured (b)LEA shall monitor'the (b)LEA shall review the <br /> 41 <br />