Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> at the property line of any residential use,would noise levels at the landfill. monitoring reports to ensure <br /> exceed an hourly average of 45 dBA during the If project-related noise compliance with this mitigation <br /> nighttime or 55 dBA during the daytime,then levels,measured at the measure. If warranted,SJCCDD <br /> setbacks and a limitation on hours of operation shall property line of any shall take the necessary actions to <br /> be mandatory. As recommended in the Forward, residential use,would correct the noise problems. <br /> Inc.,Landfill Use Permit Modifications,the option exceed an hourly average of <br /> of a soundwall at 9690 Austin Road shall be 45 dBA during the nighttime <br /> available to the resident. or 55 dBA during the 1' <br /> daytime,then setbacks and a <br /> limitation on hours of <br /> operation shall be <br /> mandatory. If noise levels <br /> warrant, SJCCDD shall <br /> make the option of a <br /> soundwall available to the <br /> resident at 9690 Austin <br /> Road. <br /> H.2 The project would extend the number NIA <br /> of years of traffic-generated noise levels at sensitive <br /> receptor locations along access roads. No <br /> mitigation measure is necessary. <br /> H3. The project,along with cumulative <br /> development,would raise ambient noise levels in <br /> the region. <br /> Please refer to Mitigation Measure H.1. See implementation See monitoring/reporting <br /> responsibility and responsibility and timing for <br /> timing/schedule for Mitigation Measure H.1 <br /> Mitigation Measure H.1. <br /> L ENERGY 11 <br /> 1.1 On-site landfill equipment and site NIA <br />