My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..... . .. .... <br /> IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORINGIREPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> lighting and heating would consume energy. No <br /> mitigation measure is necessary. <br /> 1.2 Off-site haul trips,bringing in landfill NIA <br /> wastes,would consume energy from petroleum <br /> fuels. No mitigation measure is necessary. <br /> 1.3 The project would have a beneficial NIA <br /> cumulative energy effect on finite fossil fuel <br /> resources. No mitigation measure is necessary. <br /> J. GEOLOGY, SOILS AND SEISMICITY <br /> J.i The existing topography would be NIA <br /> permanently altered,with the landfill areas reaching <br /> a maximum elevation of 150 feet MSL and the <br /> borrow area to the north about 9 feet MSL at <br /> closure. No mitigation measure is warranted. <br /> J.2. Excavation and landfilling on the N/A <br /> project site would permanently convert prime <br /> agricultural land to non-agricultural use. No <br /> mitigation measure is feasible. <br /> 1.3. Over the life of the project, soils on the <br /> project site may be determined to be of inadequate <br /> supply and/or quality for use as daily cover, and soil <br /> import could be required. <br /> (a) Should additional cover material be needed, (a) Should additional cover (a) LEA shall monitor the available <br /> alternative daily covers,approved by the CIWMB, material be needed LEA daily cover at the landfill and <br /> shall be examined and used. A demonstration shall direct the operator to ensure that alternative daily covers <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.