Laserfiche WebLink
..... . .. .... <br /> IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORINGIREPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> lighting and heating would consume energy. No <br /> mitigation measure is necessary. <br /> 1.2 Off-site haul trips,bringing in landfill NIA <br /> wastes,would consume energy from petroleum <br /> fuels. No mitigation measure is necessary. <br /> 1.3 The project would have a beneficial NIA <br /> cumulative energy effect on finite fossil fuel <br /> resources. No mitigation measure is necessary. <br /> J. GEOLOGY, SOILS AND SEISMICITY <br /> J.i The existing topography would be NIA <br /> permanently altered,with the landfill areas reaching <br /> a maximum elevation of 150 feet MSL and the <br /> borrow area to the north about 9 feet MSL at <br /> closure. No mitigation measure is warranted. <br /> J.2. Excavation and landfilling on the N/A <br /> project site would permanently convert prime <br /> agricultural land to non-agricultural use. No <br /> mitigation measure is feasible. <br /> 1.3. Over the life of the project, soils on the <br /> project site may be determined to be of inadequate <br /> supply and/or quality for use as daily cover, and soil <br /> import could be required. <br /> (a) Should additional cover material be needed, (a) Should additional cover (a) LEA shall monitor the available <br /> alternative daily covers,approved by the CIWMB, material be needed LEA daily cover at the landfill and <br /> shall be examined and used. A demonstration shall direct the operator to ensure that alternative daily covers <br /> 43 <br />