Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> project has already been authorized. investigate and use approved by the CIWMB are used <br /> alternative daily covers, where appropriate. <br /> approved by the CIWMB. <br /> JA Seismic shaking could disturb slope stability, <br /> drainage features, linear integrity,and settlement of <br /> the landfill,over the life of the projector after <br /> closure. <br /> (a) The project sponsor will comply with the (a)As part of the project (a) LEA shall verify that the final <br /> requirements of the California Code of Regulations design,Operator shall design for the project complies with <br /> (CCR)Title 27. The CIWMB will receive all comply with the the requirements of this mitigation <br /> documentation relating to slope and foundation requirements of the CCR measure and that documentation <br /> studies and design. Title 27. The CIWMB will relating to slope and foundation <br /> receive all documentation studies and designs have been sent <br /> relating to slope and to the CIWMB. SJCCDD shall <br /> foundation studies and verify that the project conforms to <br /> design. the final design. <br /> K. HYDROLOGY, GEOHYDROLOGY, AND <br /> WATER QUALITY <br /> K.I Reconfiguration and relocation of the NIA <br /> North Branch of the South Fork of Little Johns 1 <br /> Creek could alter the flow regime and affect flow f <br /> velocity,erosion and sedimentation on the site or in <br /> the adjacent upstream or downstream reach of the <br /> stream. No mitigation measure is necessary. <br /> K.2. The project would relocate the <br /> existing 100-year floodplain,and if inadequate <br /> replacement storage volume or routing of <br /> floodflows occurred,the project could contribute to <br /> upstream or downstream flooding or expose the <br />