Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> landfill to effects of the 100-year flood. <br /> (a) The project includes channel reconfiguration (a)Operator shall include in (a) SJCPW shall verify that the <br /> and localized flood protection berms to isolate the the final design localized construction of the relocated <br /> landfill surfaces from floodwaters. flood protection channel includes localized flood <br /> berms to isolate the landfill protection berms to isolate the <br /> surfaces from floodwaters. landfill surfaces from floodwaters. <br /> (b) The project design also includes provision of (b)Operator shall include in (b) SJCCDD and SJCPW-Flood <br /> replacement floodplain area and storage volume in the project plans and Control shall verify that the project <br /> an easement along the relocated North Branch of specifications,provision for plans and specifications provide <br /> the South Fork of Little Johns Creek. replacement of floodplain replacement floodplain area and <br /> area and storage volume in storage volume in an easement <br /> an easement along the` along the relocated North Branch of <br /> relocated North Branch of the South Fork of Little Johns <br /> the For of Little Johns Creek. <br /> Creek. y <br /> (c) The channel and floodplain storage easement (c) Operator shall design the (c) SJCCDD and SJCPW shall <br /> are designed to accommodate the 100-year,24-hour channel and floodplain verify that the project plans and <br /> storm. The design also includes a three foot storage easement to specifications provide a channel <br /> freeboard. accommodate the 100-year, and floodplain storage easement <br /> 24-hour storm. The design adequate to accommodate the 100- <br /> shall also include a three year, 24-hour storm and includes a <br /> foot freeboard. three foot freeboard. SJCCDD and <br /> SJCPW-Flood Control shall verify <br /> that the project complies with these <br /> plans and specifications. <br /> K.3. Stormwater runoff from landfill <br /> surfaces, if not properly controlled,could contribute <br /> to increased peak flows downstream,or degrade <br /> surface water in receiving waters. <br /> 45 <br />