Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> <RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> (a) The surface water conveyance system, (a)Operator shall include in (a)SJCCDD and SJCPW-Flood <br /> including the detention pond would be designed to the final design a surface Control shall verify that the <br /> handle the 100-year storm. water conveyance system, construction plans include a surface <br /> that would handle the 100- water conveyance system,that <br /> year storm. would handle the 100-year storm. <br /> SJCCDD shall verify that the <br /> project complies with these plans. <br /> (b) Stormwater runoff from the working face (b) SJCPW-Flood Control (b)During site visits,LEA staff <br /> would be collected at the edges of the landfill and shall direct the operator to shall verify that stormwater runoff <br /> routed to the perimeter leachate collection trenches. conduct his operations such from the working face is being <br /> that stormwater runoff from collected at the edges of the landfill <br /> the working face would be and routed to the perimeter leachate <br /> collected at the edges of the collection trenches, <br /> landfill and routed to the <br /> perimeter leachate collection <br /> trenches. <br /> (c) The timing of the pumped discharge from the (c)Operator shall design the (c)SJCCDD and SJCPW-Flood <br /> detention ponds must not occur with the peak flow storm water pump station Control shall verify that the <br /> rate of Little Johns Creek as this would impact with a telemetry system, construction plans for the storm <br /> downstream locations by increasing the flood which monitors the flow in water pump station includes a <br /> hazard. Telemetry,which monitors the flow in the the Creek and will only telemetry system,which monitors <br /> Creek to determine the peak, should then be used to allow the pumps to turn on the flow in the Creek and will only <br /> coordinate the start up of the pumps. once the peak flow has allow the pumps to turn on once the <br /> passed. peak flow has passed. <br /> KA. Uncontrolled erosion from soil <br /> stockpiles and landfill surfaces,or inadvertent spills <br /> of refuse or other substances on-site could <br /> contaminate surface water. <br />