My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012793
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2600 - Land Use Program
>
EIR-99-2
>
SU0012793
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2020 12:22:48 PM
Creation date
9/4/2019 10:03:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012793
PE
2675
FACILITY_NAME
EIR-99-2
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336-
APN
20106005
ENTERED_DATE
1/6/2020 12:00:00 AM
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\A\AUSTIN\9999\EIR-99-2\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPACTIMITIGATION MEASURES IMPLEMENTATION MONITORING/REPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMINGISCHEDULE 'TIMING <br /> (a) The final bridge design shall include structural (a) Operator shall des ign'the (a) SJCCDD and SJCPW-Flood <br /> controls to prevent spilled or tracked sediment from bridge with structural Control shall verify that the bridge <br /> entering the stream channel,and shall be regularly controls to prevent spilled or construction plans contains <br /> cleared of accumulated sediment and refuse. tracked sediment from structural controls to prevent spilled <br /> Accumulated material shall be properly disposed of entering the stream channel. or tracked sediment from entering <br /> in the landfill. SJCCDD will direct the the stream channel. SJCCDD shall <br /> operator to regularly remove verify that the bridge construction <br /> accumulated sediment and is in conformity with the plans. <br /> refuse from the bridge and LEA staff will verify during field <br /> properly dispose of same in visits that the operator regularly <br /> the landfill. removes accumulated sediment and <br /> refuse from the bridge and properly <br /> disposes of same in the landfill. <br /> (b) Additional measures described in Section III.G, (b) See implementation (b) See monitoring/reporting <br /> Air Quality,Mitigation Measure G.1,would also responsibility and responsibility and timing for <br /> minimize dust impacts. timing/schedule for Mitigation Measure G.I <br /> Mitigation Measure G.1. <br /> K.5. Groundwater contamination would <br /> result if the liner and leachate collection system for <br /> the expansion failed. iD <br /> (a) Landfill design includes a separation between (a)Operator shall design the (a)LEA shall verify that the <br /> the liner and groundwater that meets all regulatory landfill with a separation construction plans for the landfill <br /> standards, between the liner and include a separation between the <br /> groundwater that meets all liner and groundwater that meets all <br /> regulatory standards. regulatory standards. LEA shall <br /> verify that the project conforms to <br /> the design. <br /> (b) The liner and leachate collection systems for (b)Operator shall design the (b)LEA shall verify that the <br /> the expansion have been designed to meet or exceed liner and leachate collection construction plans for the liner and <br /> 47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.