Laserfiche WebLink
IMPACT/MITIGATION MEASURES IMPLEMENTATION MONITORINGIREPORTING MITIGATION <br /> RESPONSIBILITY AND RESPONSIBILITY AND VERIFICATION <br /> TIMING/SCHEDULE TIMING <br /> the regulatory requirements. systems for the expansion to leachate collection systems for the <br /> meet or exceed the expansion meet or exceed the <br /> regulatory requirements. regulatory requirements. SJCCDD <br /> shall verify that the liner and <br /> leachate collection system are <br /> constructed. <br /> (c) The project includes a leak detection system,a (c)Operator shall design the (c) LEA shall verify that the <br /> series of secondary collection trenches beneath the project with a leak detection construction plans provide the <br /> liner and directly under the leachate collection system,a series of secondary expansion project with a leak <br /> trenches. collection trenches beneath detection system,a series of <br /> the liner and directly under secondary collection trenches <br /> the leachate collection beneath the liner and directly under <br /> trenches. the leachate collection trenches. <br /> SJCCDD shall verify that the leak <br /> detection system is constructed. <br /> (d) The operator would remove hazardous (d)LEA shall direct the d)During site visits,LEA staff <br /> materials spotted during delivery,thus minimizing operator to remove shall verify that the operator is <br /> the potential for leachate contamination if there is a hazardous materials spotted removing hazardous materials <br /> break in the liner or the leachate collection trenches, during delivery,thus spotted during delivery,thus <br /> minimizing the potential for minimizing the potential for <br /> leachate contamination if leachate contamination if there is a <br /> there is a break in the liner break in the Iiner or the leachate <br /> ` or the leachate collection collection trenches. <br /> trenches. <br /> (e) The landfill operator would include practices (e) SJCCDD shall include e) SJCCDD shall verify that the <br /> and procedures in the Solid Waste Facilities Permit practices and procedures in Solid Waste Facilities Permit <br /> to comply with AB 1760. The procedures would the Solid Waste Facilities includes practices and procedures to <br /> describe how the expanded landfill would salvage Permit to comply with AB comply with AB 1760. During site <br /> all economically feasible metallic discards. 1760. As part of the landfill visits,the LEA shall verify that the <br /> expansion project,LEA will operator is salvaging all <br />