Laserfiche WebLink
Draft Supplemental Environmental Impact Report Page II-19 <br /> Forward Inc. Landfill 2018 Expansion Project <br /> STVAPCD's "net-zero" mitigation a1212roach or pollutant by pollutant <br /> mitigation approach.The a112licant shall execute such VERA prior to the <br /> start of the proposed Project(i.e., landfill expansion up to 8.1 mcy of new <br /> capacity). <br /> The VERA shall use the estimated emissions above the significance <br /> thresholds in this SEIR as the emissions to be reduced, unless operator <br /> provides and San Toaquin County approves a revised air quality impact <br /> assessment(in consultation with STVAPCD)for the Project's future actual <br /> emissions (annually) instead of the estimated emissions in this SEIR. <br /> (c)Pave roads as necessary to reduce PM emissions above current actual <br /> baseline levels from the operation of the new 8.1 MCY waste disposal area <br /> (from increased truck trips). <br /> Regional Criteria Pollutants Emission Mitigation <br /> The applicant shall implement one or a combination of the following options to <br /> reduce air quality emissions below the thresholds. <br /> (a)Limit future truck trips to an annual average of 233 truck trips per day. <br /> Currently the baseline truck trips are 233 trips per day and the permitted <br /> limit is 640 trips per day. Maintaining the annual average truck trips at 233 <br /> trips per day would mean there are no "increased" NOx, PMlo, or PM_, <br /> emissions because of the Project.The proposed Project would not increase <br /> truck traffic at the landfill over the current baseline. <br /> (b)The applicant shall enter into a Voluntary Emissions Reduction Agreement <br /> (VERA)with STVAPCD to mitigate the Project's mobile related emissions <br /> for NOx, PMlo, and PM9_5 to a less than significant impact utilizing either the <br /> STVAPCD's "net-zero" mitigation approach or pollutant by pollutant <br /> mitigation approach.The applicant shall execute such VERA prior to the <br /> start of the proposed Project(i.e., landfill expansion up to 8.1 mcy of new <br />