Laserfiche WebLink
k. The Water Supply Facilities Impact Mitigation Fee will be required when the parcels are <br /> developed. The fee is due and payable at the time of building permit application. The <br /> fee currently is$1,069.00 per single-family dwelling unit. If no building permit is required, <br /> the fee will be exempt. The fee shall be automatically increased on January 1 of each <br /> year at the rate of 6.9 percent. An additional 3.5 percent shall be added to the fee upon <br /> payment for processing and administering the program. (Resolution R-91-327) <br /> 1. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. The fee currently is$2.88200 per <br /> single-family dwelling unit in the Stockton area The fee shall be automatically adjusted <br /> July 1 of each year by the Engineering Construction Cost Index as pubr"ished by the <br /> Engineering News Record. (Resolutions R-90-304 & R-91-1025) <br /> M. This subdivision is approved for recording as a single unit. Phasing is not approved. <br /> (Planning Title Section 9-9353) <br /> n. A Preliminary Soils Report is required in accordance with County standards for the <br /> purpose of determining the R-Value for the design of the roads. (Planning Title Section <br /> 9-9104) <br /> o. All utilities shall be underground except power transmission facilities of 35 KV or greater. <br /> Public utility easements shall be provided along the road frontage of the subdivision and <br /> as required by the public utility companies. (Planning Title Section 9-9390) <br /> P. The subdivider shall agree to and shall pay service fees for the County-provided utility <br /> services in an amount equal to the estimated fees for the period from the time the <br /> improvements are accepted until the effective date of assessment on the tax roll. Deposit <br /> of fees shall be submitted at the time of acceptance of the facilities by the County. <br /> (Subdivision Map Act Section 66493) <br /> q. All traffic signs and markings shall conform to the Manual on Uniform Traffic Control <br /> Devices and San Joaquin County Standards, and they shall be shown on the <br /> improvement plans. (Planning Title Section 9-9301) <br /> r. An Offer of Dedication of groundwater rights is required. <br /> s. Water and sewer services shall be provided for APN 177-230-45 and capped or plugged <br /> at the right-of-way line. <br /> 3. PUBLIC HEALTH SERVICES: <br /> a. Connection to a public sewer system is required. <br /> b. This project shall be provided with public water. <br /> 0cr,cit�crs cl AGr,rcvai ' 4 - SU-'i2-;3 <br />