Laserfiche WebLink
i <br /> PC : 3-17-88 <br /> ER-88-1/GP-87-16/ <br /> ZR-87-35/SU-87-23 <br /> A Draft Environmental Impact Report was prepared on the project <br /> by Mills Associates in December 1987 . The Planning Commission <br /> conducted a pubic hearing on the Draft EIR on January 21 , 1988 . <br /> Following the end of the 45-day public review period on the Draft <br /> EIR on February 4 , 1988 , the EIR consultant prepared the Final <br /> EIR. The Final EIR consists of comments made on the Draft EIR, <br /> responses to those comments , and revisions to the Draft . Copies <br /> of the Final EIR were distributed to the Planning Commission, <br /> commenting agencies , and individuals on February 24 , 1988 . <br /> The Final EIR identifies five significant environmental impacts . <br /> These impacts have not been mitigated toa level of non- <br /> significance , based on current project design. In order to <br /> approve the project as proposed, findings of overriding con- <br /> sideration must be made by the Planning Commission. <br /> In addition, prior to any action to approve or conditionally <br /> approve the General Plan Amendment , Zone Reclassification, and <br /> Major 5ubdivision, ,the Final EIR will need to be certified as <br /> adequate . Certification findings are included in this staff <br /> ` report as Attachment A. <br /> r <br /> -13- <br />