My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012885
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CANEPA
>
8721
>
2600 - Land Use Program
>
SU-92-15
>
SU0012885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 4:51:22 PM
Creation date
9/4/2019 10:53:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012885
PE
2611
FACILITY_NAME
SU-92-15
STREET_NUMBER
8721
Direction
N
STREET_NAME
CANEPA
STREET_TYPE
RD
City
STOCKTON
Zip
95212-
APN
08640008
ENTERED_DATE
1/14/2020 12:00:00 AM
SITE_LOCATION
8721 N CANEPA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\C\CANEPA\8721\SU-92-15_SU-87-21\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> PC : 3-17-88 <br /> ER-88-1/GP-87-16/ <br /> ZR-87-35/SU-87-23 <br /> A Draft Environmental Impact Report was prepared on the project <br /> by Mills Associates in December 1987 . The Planning Commission <br /> conducted a pubic hearing on the Draft EIR on January 21 , 1988 . <br /> Following the end of the 45-day public review period on the Draft <br /> EIR on February 4 , 1988 , the EIR consultant prepared the Final <br /> EIR. The Final EIR consists of comments made on the Draft EIR, <br /> responses to those comments , and revisions to the Draft . Copies <br /> of the Final EIR were distributed to the Planning Commission, <br /> commenting agencies , and individuals on February 24 , 1988 . <br /> The Final EIR identifies five significant environmental impacts . <br /> These impacts have not been mitigated toa level of non- <br /> significance , based on current project design. In order to <br /> approve the project as proposed, findings of overriding con- <br /> sideration must be made by the Planning Commission. <br /> In addition, prior to any action to approve or conditionally <br /> approve the General Plan Amendment , Zone Reclassification, and <br /> Major 5ubdivision, ,the Final EIR will need to be certified as <br /> adequate . Certification findings are included in this staff <br /> ` report as Attachment A. <br /> r <br /> -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.