Laserfiche WebLink
• <br /> Drainage: A field review of the site conducted in January of 1998 revealed storm drainage <br /> problems. Drainage water was standing to the center of Hewitt road, approximately 300 <br /> feet north of Navarro Court. The Department of Public Works has asked for a drainage <br /> study to determine solutions to the drainage problem. A study has not yet been prepared, <br /> and it is not clear that a solution is readily available. Pursuant to CEQA, the project cannot <br /> proceed until a solution to the drainage problem is determined to be feasible. It must also <br /> be determined that that any proposed solution to drainage does not negatively impact any <br /> protected species or habitat as mentioned previously. <br /> • School Impacts: In the attached letter dated April 3, 2000, the Linden Unified School District <br /> stated that this project will have an impact on their school facilities. <br /> KL:vb <br /> su9705 <br />�I <br />