Laserfiche WebLink
_ Statement of Planned Site Improvements: <br /> The planned site improvements is to grow from the current cow herd population to the optimal cow herd <br /> population that the property will accommodate. The growth is planned in two phases. <br /> Growth chart: <br /> Type of cow Current Phase I Phase II** <br /> Lactating cow 420 1122 3020 <br /> Dry&Bred heifers 156 128 380 <br /> Heifers 144 0 0 <br /> Calves 30 0 0 <br /> Totals 750 1250 3400 <br /> Phase I deals with two segments of the facility. First is to build a new, state of the art milling parlor. <br /> Second. as the parlor is being built there will be improvements to the manure management system. <br /> A second lagoon will be built. Its capacity will be 8,270,000 gallons, which with the capacity of the <br /> existing lagoon of approximately 3,922,000 gallons, will total 12,192.000 gallons. <br /> The projected capacity required at this facility based on 180 days of storage for waste. corral and concrete <br /> rainfall runoff from the normal 14.74 inches plus 3.5 inches from a 25 year 24 hour storm is 13.193,300 <br /> gallons. <br /> **Note that Phase II requires that an anticipated purchase of a neighboring property be completed and <br /> legally recorded prior to implementation. <br /> Western Design/David Avila 2000 5 <br />