My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002629 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DODDS
>
27398
>
2600 - Land Use Program
>
SA-99-88
>
SU0002629 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:21 AM
Creation date
9/4/2019 5:31:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0002629
PE
2633
FACILITY_NAME
SA-99-88
STREET_NUMBER
27398
Direction
E
STREET_NAME
DODDS
STREET_TYPE
RD
City
ESCALON
APN
20121001
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
27398 E DODDS RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DODDS\27398\SA-99-88\SU0002629\SS STDY.PDF \MIGRATIONS\D\DODDS\27398\SA-99-88\SU0002629\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Statement of Planned Site Improvements: <br /> The planned site improvements is to grow from the current cow herd population to the optimal cow herd <br /> population that the property will accommodate. The growth is planned in two phases. <br /> Growth chart: <br /> Type of cow Current Phase I Phase II** <br /> Lactating cow 420 1122 3020 <br /> Dry&Bred heifers 156 128 380 <br /> Heifers 144 0 0 <br /> Calves 30 0 0 <br /> Totals 750 1250 3400 <br /> Phase I deals with two segments of the facility. First is to build a new, state of the art milling parlor. <br /> Second. as the parlor is being built there will be improvements to the manure management system. <br /> A second lagoon will be built. Its capacity will be 8,270,000 gallons, which with the capacity of the <br /> existing lagoon of approximately 3,922,000 gallons, will total 12,192.000 gallons. <br /> The projected capacity required at this facility based on 180 days of storage for waste. corral and concrete <br /> rainfall runoff from the normal 14.74 inches plus 3.5 inches from a 25 year 24 hour storm is 13.193,300 <br /> gallons. <br /> **Note that Phase II requires that an anticipated purchase of a neighboring property be completed and <br /> legally recorded prior to implementation. <br /> Western Design/David Avila 2000 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.