Laserfiche WebLink
t' <br />Kerry Sullivan -2- <br />COMMENTS ON DEVELOPMENTS <br />UP -01-08 <br />3. The Traffic Impact Mitigation Fee will be required for this development. The fee is�due <br />and payable at the time of building permit application. (The fee currently is $ 157.45 per <br />daily trip -end generated in the Lockeford area. The fee shall be automatically adjusted <br />July 1 of each year by the Engineering Construction Cost Index as published by the <br />Engineering News Record. A credit may be allowed if it can be verified that the existing <br />development on this site was in operation on or after April 23, 1990.) <br />(Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br />4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />5. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br />development has met the requirements of the Waste Plan Format for Development <br />Projects. Final Site Plan is required upon submittal of verification. <br />GK:BN:wc <br />PS-IF096-WIB <br />