Laserfiche WebLink
S' • a <br /> - -FROM,:' � FAX NO. :2099315186 �. 06 2003 04:50PM P8 <br /> B. Your conditions of approval do not indicate that your <br /> approval is contingent upon the prior approval of another, different <br /> government agency. <br /> C. Second, I submitted the information requested by the <br /> Water Board on March 97th as well as again last week. Evidently <br /> because of State budget cuts they do not anticipate even looking at <br /> my file prior to the middle of May. If this Is true it will be a hugely <br /> damaging blow to our schedule and our business, I cannot imagine <br /> why, given the exposure and knowledge you have of my project, <br /> you are not able to cooperate with me and allow me to move <br /> forward. <br /> d• Thirdly, most people knowledgeable of wastewater and <br /> who are familiar with the details of our project believe we are too <br /> small to be of a significant concern to the State Board. <br /> E. Ti O'Brienof the California Regional Water Qality Board hgs asked i <br /> Me. "W at is It about LoUE prodect that has environ ental ealth San <br /> Joa uln Co t sou eas a out your ro'ect? <br /> I told him I do not honestly know, I myself am intrigued. What have you <br /> told him? The concern for buses seems a common thread. <br /> F. You have mentioned, "it is reafly a stretch to utilize a se tics to on a <br /> industrial Project..11ke yours". <br /> It is very disconcerting If you actually feel this way at this late date after all <br /> I have done. <br /> The system that Chesney consulting designed has a number of large <br /> margins of Safety Incorporated as key elements of its design. I am not <br /> even going to reiterate the total margin of safety in this document. <br /> As a practical matter since moving to San Joaquin County 8 years ago, <br /> we have been at the same facility utilizing a septic system that was never <br /> sized or designed for the type of use we are proposing, We have had no <br /> problems and to the best of my knowledge the system was only recently <br /> pumped out for the first time. <br /> G. You have stated that we have corn late chap ed our ro ect since we <br /> fist proposed it. <br /> There have indeed been numerous small changes to the design and ! <br /> layout of our facility, as you would expect when designing a brand new <br /> facility. We have however not changed the main concept of what we are <br /> doing. <br /> The biggest change Is that we are not putting our offices In the 2114 floor of <br /> the brick building but rather are locating them on a mezzanine in the new <br /> metal building. The second floor of the brick building will now instead <br /> Page 4 <br />