Laserfiche WebLink
i <br /> Item No. <br /> PC: 4-15-93 <br /> SA-93-4 <br /> Page 10 <br /> 4. BUILDING INSPECTION DIVISION: <br /> a The following Uniform Building Code and San Joaquin County Ordinance requirements <br /> will be applicable and shall be incorporated in the construction plans before submittal to <br /> the Building Inspection Division: <br /> (1) Exterior walls less than 20 feet from a property line shall be constructed of one- <br /> hour fire resistive material <br /> (2) The proposed building shall be provided with an automatic fire sprinkler system <br /> or divided into areas less than 6,000 square feet by area separation walls. <br /> {3} Provide restrooms conforming with all disabled access requirements (CCR, Title <br /> 24). <br /> (4) All recommendations of the soils engineer that were included in the soils report <br /> shall be incorporated In the construction drawings. <br /> (5) The proposed project is located within an expansive soil area where a <br /> conventional foundation may not be suitable. Therefore, an engineer is required <br /> to evaluate the foundation design. <br /> b. A grading plan shall be submitted by the: applicant, and it shall be approvedand a <br /> grading permit issued by the Building Inspection Division prior to any excavation or filling <br /> of earth material: <br /> (1) The grading plan shall contain the information listed in the UBC, Appendix, <br /> Chapter 70, Section 7006(1). <br /> (2) The grading plan shalt include complete drainage.details and elevations of the <br /> adjacent parcels. Retaining wall details shall be submitted where applicable. <br /> (3) Grading in excess of 5,000 cubic yards shall comply with Section 7014 of <br /> 'Engineered Grading Requirements! <br /> (4) All recommendations of the soils engineer shall be incorporated in the grading <br /> plans. <br /> (5) All compaction reports must be submitted to a foundation inspection. <br /> (6) All grading permits are subject to approval by the other departments. <br /> (7) All grading authorized by the permit shall be approved prior to issuance of any <br /> building permits or the beginning of any construction. <br />