Laserfiche WebLink
Chandler Martin -2- <br />COMMUNTI`Y DEVELOPMENT <br />PA -06-647 (SA) <br />4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br />time of building permit application. The fee currently is $1,310.00 per 1000 gross square foot of building <br />designated as office/services. The fee is based on the current schedule. (Resolution R-06-38) <br />5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br />and payable prior to issuance of the building permit. (The fee currently is $651.35 per 1,000 gross square <br />foot of building designated as Service/Commercial. The fee shall be automatically increased on January 1 of <br />each year through the year 2015 at the rate of 4.55 percent.) <br />(Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br />6. A County Stormwater permit is required for this project. The drainage system shall be designed to treat the <br />85'" percentile storm. <br />7. Storm water shall be drained through a sand/oil separator prior to discharging into the storm water retention <br />pond. <br />8. All repair work shall be performed inside building. All shop floor drains shall be plumbed to drain to the <br />sanitary sewer per City of Stockton standards. <br />9. The operation shall be provided with a covered waste area equipped with drainage containment features <br />MRC:DG:av <br />P 1COMM NTSSA%YR 20 TA-0WM 7 wpa <br />