Laserfiche WebLink
Revised Conditions of Approval <br /> SA-92-0057 <br /> Page 2 <br /> by a credit toward the former use (truck stop) as <br /> "Manufacturing" at $1, 102 . 00 per 1, 000 gross square foot <br /> of building. The fee shall be automatically adjusted <br /> July 1 of each ublishedbb the <br /> hthen Engineering Construction <br /> Index as p <br /> News Record. ) <br /> Y <br /> (Resolution R-90-304 , R-91-1025) <br /> b. The Water Supply Facilities Impact Mitigation Fee will be <br /> required for this development. The fee is due and <br /> payable at the time of building permit application. (The <br /> Fee currently is $88 . 89 per 1, 000 gross square foot of <br /> building as Warehouse. " The fee can be exempted if the <br /> building floor area addition is 200 square feet or less. <br /> The fee shall be automatically increased on January 1 of <br /> each year at the rate of 6 . 9 percent. An additional <br /> percent shall be added to the fee upon payment for <br /> processing and administering the program. (Resolution <br /> R-91-327) <br /> 3 . PUBLIC HEALTH SERVICES <br /> a. The structure shall only be for dry storage of <br /> pesticides. <br /> b. No mixing of liquid or powders with liquids shall be <br /> permitted. <br /> 4 . BUILDING INSPECTION DIVISION <br /> a. The following Uniform Building Code and San Joaquin <br /> County Ordinance requirements will be applicable and <br /> shall be incorporated in the construction plans before <br /> submittal to the Building Inspection Division: <br /> (1) Exterior walls less than 20' (feet) from a property <br /> line shall be of one-hour, fire-resistive <br /> construction. <br /> fire , ___ <br /> _TQI[ra}ng, mCCRa1-r <br />