Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. 99-134 -8- <br /> RICHARD A. STAGNO <br /> STAGNO'S MEAT COMPANY <br /> SAN JOAQUINCOUNTY <br /> E. Provisions: <br /> 1. The Discharger shall comply with the Monitoring and Reporting Program No. 99-134, <br /> which is part of this Order, and any revisions thereto as ordered by the Executive <br /> Officer. <br /> 2. The Discharger shall comply with the "Standard Provisions and Reporting <br /> Requirements for Waste Discharge Requirements", dated 1 March 1991,which are <br /> attached hereto and by reference a part of this Order. This attachment and its individual <br /> paragraphs are commonly referenced as "Standard Provision(s)." <br /> 3. In the event of any change in control or ownership of land or waste discharge facilities <br /> described herein, the Discharger shall notify the succeeding owner or operator of the <br /> existence of this Order by letter, a copy of which shall be immediately forwarded to this <br /> office. <br /> 4. The Discharger shall comply with all conditions of this Order, including timely <br /> submittal of technical and monitoring reports as directed by the Executive Officer. <br /> Violations may result in enforcement action, including Regional Board or court orders <br /> requiring corrective action or imposing civil monetary liability, or in revision or <br /> rescission of this Order. <br /> 5. The location of the final wastewater treatment pond shall be consistent with the <br /> proposed location in the CEQA documents. <br /> 6. The Discharger shall comply with the following time schedule to assure compliance <br /> with Groundwater Limitations in Section D of this Order. <br /> Task Compliance Date <br /> Submit Groundwater Monitoring Workplan 60 days from Issuance of this Order <br /> Submit Well Installation Report 30 days Prior to Commencement of <br /> Slaughterhouse Operations <br /> Prior to construction,plans and specifications for groundwater monitoring wells shall be <br /> submitted as a workplan to Board staff for review and approval. This workplan shall <br /> include the following: <br /> • location of upgradient and downgradient wells on map of the site; <br /> • drilling and development methods; <br /> • well construction details as shown on a construction diagram; <br />