Laserfiche WebLink
Bur <br /> r "�` i P.O. BOX 1810-1810 E. HAZELTON AVENUE <br /> ` THOMAS R. FLINN STOCKTON, CALIFORNIA 95201 <br /> •` DIRECTOR <br /> �. -' �• (209)4683000 FAX ubw 468-2999 <br /> '�r:aA"� r wwwsjgov.org/pubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MANUEL SOLORIO Working for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN wINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES C^ERI E) <br /> BUSINESS ADMINISTRATOR fIGV 3/ EG <br /> FEB 2 6 2007 <br /> February 26,2007 <br /> Community Development Dept, <br /> MEMORANDUM <br /> TO: Raymond Hoo, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Kevin Swanson <br /> FROM: Dean Gilman, Engineer IV <br /> Public Services Division <br /> SUBJECT: PA-06-064 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE AN EXISTING 17,000 <br /> SQUARE FOOT PARCEL INTO TWO PARCELS,TO ACCOMMODATE THE EXISTING <br /> TWO HOUSES ON THE PARCEL. PARCEL ONE TO CONTAIN 7,608 SQUARE FEET, <br /> AND PARCEL TWO TO CONTAIN 9,392 SQUARE FEET, LOCATED ON THE <br /> NORTHEAST CORNER OF IONE STREET AND FRONT STREET. (SUPERVISORIAL <br /> DISTRICT 4) <br /> PROPERTY OWNER: David and Paul Mazzera,Trust etal APPLICANT: Dillon&Murphy <br /> ADDRESS: 18721 E. Front Street APN: 091-210-24 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Front Street has an existing right-of-way width that varies (60 to 50 feet)and a planned right-of-way width of <br /> the same. Ione Street has an existing right-of-way width of 50 feet and a planned right-of-way width of the same. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application. <br /> The Regional Traffic Impact Fee will be required when parcels are developed. The fee is due and payable at the <br /> time of building permit application. <br /> RECOMMENDATIONS: <br /> I. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. All easements of record shall be shown on the Parcel Map. (Development Title Section 9-910.20) <br /> 3. The project shall be served by a public sewer collection system constructed in conformance with the <br /> requirements of the San Joaquin County Public Health Services Environmental Services Division and the <br /> Department of Public Works. Service shall be provided by the Linden County Water District. <br /> (Development Title Section 9-1105.2) <br />