Laserfiche WebLink
ProLogis Pond,Robinson&Associates,LP <br /> Patterson Pass Business Park#6-Tracy,CA Project No.051928 <br /> February 2005 Page 6 <br /> SECTION 2.0—RECOMMENDED WORK ITEMS <br /> 2.0-A CURRENT WORK ITEMS COST YEAR <br /> 1. Perform annual roof maintenance and repairs as required. Maintenance 1 <br /> 2. Restripe asphalt pavement on an annual basis and make minor pavement Maintenance I <br /> repairs. <br /> 3. Perform annual maintenance on tilt wall concrete panel joint sealants, <br /> pavement to building joint sealants and sidewalk to pavement joint Maintenance 1 <br /> sealants. <br /> Total,Current Work Items Maintenance <br /> 2.0-13 ANTICIPATED WORK ITEMS COST YEAR <br /> 4. Apply slurry seal coat and restripe asphalt pavement on a four-year $8,000 4 <br /> schedule,allowing for crack sealing and minor repairs. Estimate based $g 000 8 <br /> on 8,000 SY x$1 per SY. <br /> 5. Anticipate the need to repaint building approximately in Years 3 and 10. $41,000 2 <br /> Estimate 41,000 SF @$1/SF. $41,000 9 <br /> 6. Remove and re-seal the tilt wall concrete panel joints. Estimate based on $6,500 2 <br /> replacing approximately 1,600 LF x$4/LF. <br /> 7. Perform annual roof maintenance and repairs as required. Maintenance 2-10 <br /> 8. Rest ripe asphalt pavement on an annual basis and make minor pavement Maintenance 2-10 <br /> repairs. <br /> 9. Perform annual maintenance on tilt wall concrete panel joint sealants, <br /> pavement to building joint sealants and sidewalk to pavement joint Maintenance 2-10 <br /> sealants. <br /> Total,Anticipated Work Items $104,500 <br />