Laserfiche WebLink
this schedule. <br /> 29. Corporation Yard Facilities: Construction shall begin prior to issuance of the 4,5001h <br /> building permit, unless the MHCSD General Manager determines that the facilities are <br /> not yet required. If the General Manager authorizes the facility to be delayed, the <br /> developer shall provide adequate bonding to the MHCSD assuring construction at the <br /> time the MHCSD General Manager determines the facilities to be required. Upon <br /> acceptance, the Facilities shall be dedicated to the MHCSD. This condition can be <br /> satisfied by an agreement acceptable to the MHCSD that the required facilities will be <br /> constructed on this schedule. <br /> 30. O& M Vehicles: Prior to the issuance of the first building permit for the tract being <br /> developed, developers will deposit in a MHCSD Maintained Vehicle Capital Fund an <br /> amount equal to their prorata share (based on the CFF Plan Fee formula as determined <br /> by the MHCSD)of the total cost of O&M Vehicles as that cost is specified in the latest <br /> update of the CFF Plan Fees. <br /> 31. Police and Fire Vehicles: Prior to issuance of the first building permit for the tract being <br /> developed, developers will deposit in a CSD Maintained Vehicle Capital Fund an amount <br /> equal to their prorata share (based on the CFF Plan Fee formula as determined by the <br /> MHCSD)of the total cost of Police and Fire Vehicles as that cost is specified in the latest <br /> update of the CFF Plan Fees. <br /> 32. Transit Vehicles: Prior to the issuance of the first building permit for the tract being <br /> developed, developers will deposit in a CSD Maintained Vehicle Capital Fund an amount <br /> equal to their prorata share (based on the CFF Plan Fee formula as determined by the <br /> CSD)of the total cost of Transit Vehicles as that cost is specified in the latest update of <br /> the CFF Plan Fees. <br /> 33. Administration Facilities: Construction of the MHCSD Administration Facility located in <br /> the town center shall begin prior to issuance of the 10,000th residential permit in the <br /> Mountain House Master Plan area. Completion of the Facilities shall be done within <br /> eighteen months of commencement of construction, unless an extension is approved by <br /> the MHCSD General Manager. Design, size and location shall be provided consistent <br /> with the most recent update of the CFI= Plan and approved by the MHCSD. Upon <br /> acceptance, the Facilities shall be dedicated to the MHCSD. This condition can be <br /> satisfied by an agreement acceptable to the MHCSD that the required facilities will be <br /> constructed on this schedule. <br /> 34. Police Substation: Construction of approximately 17,000 s.f. Phase One Police <br /> Substation shall begin prior to issuance of the 7500th residential permit in the Mountain <br /> House Master Plan area. The exact size shall be as determined by the MHCSD General <br /> Manager. Completion of the Facilities shall be completed within eighteen months of <br /> commencement of construction. Design, size and location shall be provided consistent <br /> with the CFF Plan, Community Approvals and approved by the MHCSD. Upon <br /> acceptance,.the Facilities shall be dedicated to the MHCSD. This condition can be <br /> satisfied by an agreement acceptable to the MHCSD that the required facilities will be <br /> constructed on this schedule. <br /> 35. Temporary Turnarounds: All streets will require temporary turnarounds unless waived <br /> by the MHCSD General Manager and shall be shown on the Improvement Plans. <br /> 36. Recyclable Construction Waste: Recycling of construction wastes, such as wood and <br /> metal, shall be made part of the improvement plans and construction specifications for <br /> contractors in compliance with MHCSD requirements. Condition shall be met before <br /> approval of final maps. <br /> 15 <br />