My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rn <br /> D <br /> n <br /> o College Park at Mountain House Specific Plan H1 <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> CL operational standards shall be established to minimize <br /> noise generated by loading dock activities from <br /> adversely affecting planned and existing off-site <br /> noise-sensitive land uses.Design and operational <br /> measures may include: <br /> < Enclose outdoor noise-generating equipment <br /> and/or set back from the property line. <br /> < Locate buildings and structures such that they <br /> shield off-site sensitive receptors from on-site <br /> noise sources,including loading dock activity. <br /> < Enclose loading dock areas <br /> w < Limit loading dock activity, including delivery <br /> 4' truck arrivals and departures, to between 7:00 <br /> a.m. and 10:00 p.m. at those loading docks with <br /> direct line of site of noise-sensitive receptors <br /> n within a distance of 1,000 feet.Activity at all <br /> other loading docks shall be limited to the hours <br /> CD <br /> between 5:00 a.m.and 10:00 p.m. <br /> CD <br /> Noise studies, including on-site sound level <br /> measurements,shall be conducted to ensure that these <br /> as thresholds are not exceeded.The noise studies shalt <br /> o be funded by the College Park developers and <br /> approved by SJCCDD before construction. <br /> T) Landscape Maintenance <br /> z <br /> The following measures shall apply to noise- <br /> C 0 generating activities associated with landscaping and <br /> co maintenance of school grounds,neighborhood parks, <br /> -0 community parks,and open space. <br /> c n < On-site landscape maintenance equipment shall <br /> 5 n be equipped with properly operating exhaust <br /> o mufflers and engine shrouds, in accordance with <br /> manufacturers' specifications. For maintenance <br /> areas located within 320 feet of noise-sensitive <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.