Laserfiche WebLink
cn0 <br /> W o <br /> m <br /> m College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> c7 Implementation.&Veriflcatfon <br /> Mitigation Measure Timing/Schedule fmpfementation <br /> ResponsibilityDate <br /> Action Competed <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> standards,the County shall extend the standard of <br /> CD LOS D to the segment of Byron Road east,of Grant <br /> C/> <br /> Line Road. <br /> CD <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP)EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12-1 Air Quality--Generation of Temporary,Short- Before construction SJVAPCD,in <br /> Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> The latest version of the San Joaquin Valley Air <br /> 0Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for.4ssessing and <br /> Mitigating stir Quality Impacts(SJVAPCD 1998)and <br /> o repeated in the`Regulatory Setting"subsection.The <br /> SJVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> ['- the SJVAPCD to implement the current version of the <br /> CD measures at the time individual development <br /> applications are received by the County for. <br /> development under College Park- <br /> 4.12-2 Air Quality--Potential Generation of Toxic Air Before construction. SJVAPCD,in <br /> 0 Contaminants(TACs) begins and during conjunction with the <br /> 3 ► Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />