My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003054
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10182
>
2600 - Land Use Program
>
SA-94-29
>
SU0003054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:38 AM
Creation date
9/5/2019 10:57:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003054
PE
2633
FACILITY_NAME
SA-94-29
STREET_NUMBER
10182
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
10182 S HARLAN RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HARLAN\10182\SA-94-29\SU0003054\APPL.PDF \MIGRATIONS\H\HARLAN\10182\SA-94-29\SU0003054\CDD OK.PDF \MIGRATIONS\H\HARLAN\10182\SA-94-29\SU0003054\EH COND.PDF \MIGRATIONS\H\HARLAN\10182\SA-94-29\SU0003054\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPEC. PRIME CONSTR. CONTRACT - EXHIBIT A June 9, 1995 <br /> Pg. 2 of 7 <br /> CONCRETE WORK (cont'd) <br /> F) Concrete pad and mixer foundations are assumed to be the dimensions shown on the <br /> structural foundation drawing. The concrete lined settling pond is assumed to be the <br /> dimensions shown on the settling pond details on the site plan. No provisions have been <br /> made for a larger concrete pad for the building foundation or mixer foundation than shown <br /> on the drawings. No provisions have been made for a larger settling pond than shown on the <br /> site plan drawings. <br /> G) Contractor has only included charges to do what grading is required to put area immediately <br /> around new addition and settling pond back to the condition it was in at the beginning of the <br /> project. Nothing has been included for site grading, paving, stabilizing, or exterior drainage. <br /> H) Contractor to furnish and install all rebar and wire mesh. Any additions will be charged as <br /> an extra under the prime construction contract. Anchor bolts to be furnished by Owner. <br /> I) Concrete quoted is five sack mix readimix concrete. Contractor acknowledges that the <br /> concrete strength must meet the requirements of the structural foundation plan notes shown <br /> on Dwg. #S2. <br /> BUILDING MODIFICATION& ADDITION <br /> Modification of Existing Building <br /> A) Building modifications are to be performed by Contractor and materials are to be supplied by <br /> Owner unless otherwise noted below. <br /> B) Building siding to all be 26 GA, standard CBC siding or LIBERTY color to match existing <br /> CBC siding. Roof and trim to be white. <br /> B) The South wall of the 1991 Dry Products addition building shall be completed and enclosed <br /> with metal siding. The metal siding and Z bars removed from the East warehouse wall shall <br /> be used to complete the South wall as material quality and quantity permits; otherwise, <br /> materials shall be new and supplied by Contractor. Contractor will provide Z bars, Z bar <br /> brackets, sheeting, screws, and flashing. <br /> C) The existing metal siding separating the East side of the warehouse and the 1991 dry stucco <br /> manufacturing addition area shall be removed with the exception of the siding up to the <br /> existing 12' roll up door opening off the South wall. This removal includes removal of the 3° <br /> door and the 12' roll up door. The old siding shall be removed up to the roof. The edge of <br /> the metal siding at the location where the old 12' roll up door shall be finished with trim <br /> (existing). <br />
The URL can be used to link to this page
Your browser does not support the video tag.