Laserfiche WebLink
SPEC. PRIME CONSTR. CONTRACT - EXHIBIT A June 9, 1995 <br /> Pg. 5 of 7 <br /> MECHANICAL EQUIPMENT <br /> A) Contractor shall furnish labor to install mechanical equipment as shown in drawings. <br /> B) Equipment shall have adequate lifting eyes. <br /> C) Equipment to be delivered assembled. <br /> D) Equipment to be delivered as per schedule. <br /> AIR SYSTEM <br /> Contractor shall furnish and install air system in accordance with the requirements of the San <br /> Joaquin County Code: <br /> A) Contractor will furnish labor to install air system as per G&Z P&ID Dwg. no. C-14747. <br /> B) Contractor will furnish pipe and fittings only as per drawings; all other parts, valves, <br /> regulators, etc. will be supplied by Owner. <br /> C) Pipe will be schedule 40 black, primered with red oxide. No internal cleaning done, except <br /> air blowing. <br /> D) Air lines shall be on easiest and shortest run possible consistent with good workmanship and <br /> construction practices. <br /> POLYMER SYSTEM <br /> Contractor shall furnish and install polymer system in accordance with the requirements of the San <br /> Joaquin County Code: <br /> A) Contractor will furnish labor to install polymer system as per G&Z P&ID Dwg. no. C-14747. <br /> B) Contractor will furnish PVC pipe and fittings only as per drawings; all other parts, valves, <br /> regulators, etc. will be supplied by Owner. <br /> C) Pipe will be schedule 80. No internal cleaning done, except air blowing. <br /> D) Polymer lines shall be on easiest and shortest run possible consistent with good workmanship <br /> and construction practices. <br />