My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008578
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HENDERSON
>
18500
>
2600 - Land Use Program
>
PA-1000266
>
SU0008578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:34 AM
Creation date
9/5/2019 11:09:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008578
PE
2611
FACILITY_NAME
PA-1000266
STREET_NUMBER
18500
Direction
S
STREET_NAME
HENDERSON
STREET_TYPE
RD
City
TRACY
APN
20917004
ENTERED_DATE
1/7/2011 12:00:00 AM
SITE_LOCATION
18500 S HENDERSON RD
RECEIVED_DATE
1/7/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\APPL.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\CDD OK.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\EH COND.PDF \MIGRATIONS\H\HENDERSON\18500\PA-1000266\SU0008578\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1064
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29. Construction Noise: The following measure shall be implemented during construction: <br /> • Construction shall be restricted to the hours of 6:00 AM to 8:00 PM on weekdays. <br /> Extended hours which may include Saturdays and Sundays may be allowed through prior <br /> notice to adjacent residents and landowners, and prior approval of the MHCSD for <br /> infrastructure construction and CDD for building permits. <br /> • All internal combustion engines shall be equipped with exhaust mufflers that are in good <br /> condition and appropriate for the equipment. <br /> Timing: Inclusion of the above measures as notes on Improvement Plans approved by CDD <br /> and MHCSD prior to Final Map approval. <br /> GEOLOGY AND SOILS <br /> 30. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD <br /> Emergency Preparedness Plan. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. [SPIT Implementation Measure 6.8.3 (1)] <br /> 31. Geotechnical Investigation Recommendations: The applicant shall follow the <br /> recommendations of the following geotechnical investigations: <br /> a. Geotechnical Exploration, Neighborhood L, Mountain House, California, prepared in <br /> September of 2010, by Engeo Incorporated. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps, and the incorporation of all recommendations of the geotechnical <br /> engineering studies into site preparation and construction of each dwelling prior to approval <br /> of building permits. [SP II Implementation Measure 6.8.3(2); San Joaquin County <br /> Development Title, Chapter 9-905] <br /> MINERAL RIGHTS <br /> 32. Surface Entry Rights: The subdivider shall provide a surface entry site located east of <br /> Central Parkway and south of the intersection of Central Parkway and Mountain House <br /> Parkway that is consistent with Specific Plan II requirements and acceptable to the CDD and <br /> MHCSD, to assure third party entry rights to access minerals. [Specific Plan II <br /> Implementation Measure (1)] <br /> Timing: Condition shall be met prior to approval of the first Final Map in Neighborhood L. <br /> HAZARDS <br /> 33. Protocols for Petroleum Hydrocarbons in soil: If indications of petroleum hydrocarbon <br /> contamination in site soil, such as staining and odors, are observed during excavation or <br /> grading activities adjacent to Byron Road, the contractor shall stop work and notify the <br /> Chevron Environmental Management Company and the RWQCB in accordance with the <br /> procedures specified in the Soil and Groundwater Management Plans for Chevron Mountain <br /> House Sites Nos. 1, 2, and 3. The contractor shall ensure that any contaminated soil and <br /> groundwater encountered during project construction is handled in a safe and lawful <br /> manner. <br /> 34. Hazardous Waste: Handling, use and storage of hazardous chemicals or materials <br /> including, but not limited to, asbestos shall be carried out in compliance with all applicable <br /> Conditions of Approval -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.