Laserfiche WebLink
41. Fencing Requirements. Buffer zones along wetland restoration areas shall be temporarily <br /> fenced during construction so as to minimize the potential for inadvertent impacts from <br /> construction activities. [SPII Implementation Measure 7.3.2 (4)]The applicant shall retain a <br /> qualified biologist or wetlands specialist to stake, using easily-observable flagging, the <br /> boundaries of all wetlands to be protected. The applicant shall organize and convene pre- <br /> construction conferences between the contractor and the project biologist or wetlands <br /> specialist to ensure that grading contractors recognize the importance of these resources and <br /> avoid all flagged areas. <br /> Timing: Improvement plans prior to commencement of grading operations adjacent to <br /> wetlands. <br /> AIR QUALITY <br /> 42. Deed Disclosure: The deeds to all project properties in the proximity to the wastewater <br /> treatment plan shall be accompanied by a written disclosure from the transferor, in a form <br /> approved by the County, advising any transferee of the potential adverse odor impacts from <br /> nearby wastewater treatment operations. <br /> 43. Residential Emissions: Construction plans for residential dwellings shall incorporate the <br /> following items: <br /> • Natural gas lines outlets shall be provided to backyards to encourage usage of natural <br /> gas barbecues. <br /> • 220 volt electrical outlets for recharging electric automobiles shall be provided in each <br /> garage. Electrical outlets shall be located on the outside of single family homes to <br /> accommodate electric lawn maintenance equipment and electric barbecues. <br /> • No wood burning fire places, unless otherwise provided by the San Joaquin Valley Air <br /> Pollution Control District ("SJVAPCD"). If fireplaces are designed to be natural gas <br /> heating appliances of a zero clearance design, there is no limitation on the number of <br /> fireplaces per unit. <br /> • Low nitrogen oxide (NOx) emitting and/or high efficiency water heaters shall be <br /> required for all dwelling units. <br /> Timing: prior to issuance of building permits. [SPII Implementation Measure 10.5 (1)] <br /> CULTURAL RESOURCES <br /> 44. Unknown Pre-Historic/Historic-Period Resources: If, during the course of any grading <br /> activity or construction, subsurface concentrations of prehistoric or historic-period materials <br /> are encountered, the San Joaquin County Community Development Department(CDD) shall <br /> be contacted immediately. All work in the vicinity of the find shall be shall be halted until an <br /> archaeologist can evaluate the materials and make recommendations for further action. <br /> Timing:At the time of the find until permission to proceed is granted by CDD. <br /> 45. Unknown Human Remains: The applicant shall comply with the County's Development <br /> Title (Chapter 9-1053M) regarding the uncovering of human remains or of a human <br /> prehistoric burial site during the course of any grading or construction. If human remains are <br /> encountered, all work shall halt in the vicinity and the County Coroner shall be notified <br /> immediately. At the same time, a qualified archaeologist shall be contacted to evaluate the finds. <br /> Conditions of Approval -9- <br />