Laserfiche WebLink
The Community Development Department has reviewed the project and will be <br /> recommending that the project be approved by the Planning Commission subject to the <br /> following Conditions of Approval. <br /> Use Permit Application No. was approved by the Planning Commission on . The <br /> effective date of approval is . This approval will expire on , which is 18 months from <br /> the effective date of approval, unless (1) all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been issued and remain in <br /> force, and (3) all necessary permits from other agencies have been issued and <br /> remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Jeff Fisher, 468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT'. The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the"SITE PLAN CHECK <br /> LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the establishment of a concrete batch <br /> plant facility. The facility will consist of a batch plant apparatus, a 1,920 square- <br /> foot office/driver lounge, and a 280 square-foot batch office. (Use Type: General <br /> Industrial — Heavy) <br /> c. BUSINESS LICENSE: The applicant shall secure an approved Business License <br /> prior to the initiation of the use. The Business License may be applied for <br /> concurrently with the building permit application. (Section 7-1000 of the County <br /> Ordinance Code) <br /> d. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site <br /> Plan. Drainage calculations prepared by a registered civil engineer or architect <br /> shall be included. <br /> e. SETBACKS: All structures shall conform to the following setback requirements: <br /> 1) All structures shall be set back a minimum of thirty (30) feet from the front <br /> property line (Development Title Table 9-510.3) <br /> f. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth of asphalt <br />