My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006921
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
2600 - Land Use Program
>
PA-0800005
>
SU0006921
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:48 AM
Creation date
9/6/2019 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006921
PE
2627
FACILITY_NAME
PA-0800005
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
APN
25313019 26
ENTERED_DATE
1/24/2008 12:00:00 AM
SITE_LOCATION
30703 S MACARTHUR DR
RECEIVED_DATE
1/11/2008 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\APPL.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\CDD OK.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH COND.PDF \MIGRATIONS\M\MACARTHUR\30703\PA-0800005\SU0006921\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
730
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Description <br /> Tracy Material Recovery Facillty and Transfer Station Expansion <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> bays and maintenance staff accommodations, for a total enclosed space of 21,420 <br /> square feet. <br /> Construction and Demolition (C&D) Processing Facility <br /> C&D debris processing operations, including wood waste chipping and grinding, will be <br /> established on an approximately 2.5 acre portion of the southern parcel, in two phases, <br /> in order to process source-separated and mixed C&D and Type A clean inert debris into <br /> reusable material. <br /> In Phase 1, the operations will be relocated to the southern area of the site depicted on <br /> the proposed Site Plan (Figure 2) and continue as a "floor sort" operation, utilizing <br /> manual labor and mobile equipment to separate the debris. Phase 2 operations will <br /> include the construction of a mechanical sort line to more efficiently process the mixed <br /> C&D materials, providing increased design capacity — to 400 TPD of mixed C&D -- as <br /> well as improved quality for the recovered recyclable materials. <br /> Inert Debris Processing Operations <br /> Inert debris processing operations will be expanded, adding onsite crushing operations <br /> and an additional one acre operations area, to the existing stockpiling operations on <br /> approximately .25 acre portion of the existing facility, in order to process source- <br /> separated Type A clean inert debris into reusable material. <br /> Infrastructure as shown an the Site Plan <br /> • Addition of approximately 85 truck parking spaces <br /> • Addition of approximately 45 employee/visitor space parking area with landscaping <br /> • Addition of paved bin and equipment storage area <br /> • Addition of paved roadway access on southern parcel <br /> Entry Signs: <br /> Entry signs are posted. The facility will be open to the general public. <br /> Station Security: <br /> Currently, the site is entirely enclosed with a 6-foot high solid chain link fence along the <br /> perimeter with locking gates on S. MacArthur Drive. The fence is slatted along portions <br /> of the frontage of S. MacArthur Drive to screen views of the interior of the site. <br /> Lighting is provided at the Inert Processing Area and C&D Operations Area. Tracy MRF <br /> & TS will utilize temporary or permanent lighting units for processing the materials <br /> before or after daylight hours. Mobile equipment and vehicles using the site are <br /> equipped with lights for safe use at night or during times of limited visibility. <br /> Tracy MRF & TS may install additional 20-to-30-foot-high stadium lighting within the <br /> facility for security purposes that will enable them to process debris before and after <br /> daylight, within the operating hours of 6:00 a.m. and 10:00 p.m. Onsite processing <br /> buildings will contain interior lighting and may have exterior lighting affixed. The lighting <br /> 14 <br /> 170.18.03 CUP Project Description 121807 <br /> E <br /> - -- + <br />
The URL can be used to link to this page
Your browser does not support the video tag.