Laserfiche WebLink
k <br /> f`f \E\E\E El <br /> hry <br /> RECLAMATION PLAN—SOLARI PIT 2002 <br /> George Reed, Inc. <br /> Page 5 <br /> E <br /> IL DESCRIPTION OF PROPOSED MINING OPERATION (continuedQ <br /> B. Estimated Production Schedule <br /> PHASE I: Product Completion Reclamation <br /> ±29 Acres 332,000 CY S/G 2010-2013 2015 <br /> 500,000 CY OB <br /> PHASE II: <br /> E +30 Acres 334,000 CY S/G 2013 -2016 2018 <br />! 500,000 CY OB <br />` PHASE III: 334,000 CY S/G 2016-2019 2021 <br /> +30 Acres 500,000 CY OB <br /> PROJECT TOTALS: 1,000,000 CY S/G <br /> 1,500,000 CY O/B <br /> NOTE: Annual Average Mining Quantities- 10 Acres/Year <br /> 166,667 CY Overburden/Year <br /> 111,333 CYSand& Gravel/Year <br /> C. Mining Plan <br /> 1.Operating Plan <br /> Excavation will commence within 18 months after obtaining a permit and will terminate with total <br /> reclamation within 11 years, dependent upon demand for materials. Excavation occurs approximately <br /> 180 days in a year. Weather conditions and market factors can alter this approximation. Excavation <br /> activity typically occurs between March—October each year. Excavation will be limited to a weekly <br /> schedule of Monday—Friday, 6:00 a.m.to 6:00 p.m., except during periods of declared national, state, <br /> or county emergency or inclement weather. <br /> 2,3.Topsoil/Overburden <br /> Topsoil / Overburden is stripped, set aside temporarily, then replaced concurrent with excavation.. <br /> Excavation is by the open pit method commencing at the Southern end of Phase I, moving in a <br /> Northerly direction,. Excavation depths average zL25'. Overburden ranges in depth from 0' to ±151, <br /> with sand and gravel depths averaging from f7' to f10'. <br /> Equipment to be used at the project site consists of: <br /> ■ Scrapers/Dozers to remove overburden <br /> ■ Backhoe/Excavator to remove sand and gravel <br /> ■ Trucks to transport materials to the existing processing facility on the North side of the <br /> Mokelumne River. <br /> ■ Motor Grader and Scraper to level and contour site for final reclamation <br /> ■ Water Truck to spread water within project area for dust control <br />