Laserfiche WebLink
1. he proposed zone district is consistent with the General Plan, any applicable <br /> Master Plan, and any applicable Specific Plan; and <br /> 2. The proposed zone district is reasonable and beneficial at the time. <br /> B. Key Plan Strategies (Volume I, 1. Growth Accommodation, pg. III-2 & 3) <br /> • Urban communities, including incorporated cities and unincorporated <br /> communities, shall accommodate the vast majority of the development, because <br /> it is in these areas that urban services exist or are expected. In particular, growth <br /> shall be directed to the cities as much as possible. <br /> The proposed project location is planned for urban development as shown on the <br /> General Plan 2010. The site is within the unincorporated urban community of Stockton, <br /> and shown as R/L on the General Plan. The adjacent parcels to the north and west are <br /> zoned R-L and are developed residentially. To the south and east is land with a General <br /> Plan designation of R/L and an AU-20 zone. <br /> D. Infrastructure Services (Volume I, 1. Wastewater Treatment, 2. Water Supply, 3. <br /> Stormwater Drainage, pg. IV-61, 63 & 67) <br /> • New development in urban communities shall have, at a minimum, access to a <br /> public wastewater system. Septic systems may be permitted in Rural Residential <br /> areas, Commercial areas adjacent to Rural Residential areas, and in Warehouse <br /> Industrial zones, if General Plan policies and Development Title regulations are <br /> not met. <br /> • New development in urban communities shall have, at a minimum, access to a <br /> public water system. In Rural Residential designations, individual wells may be <br /> permitted if parcels are two acres or greater and no public water system exists. <br /> • New development in urban communities shall have, at minimum, access to a <br /> public drainage system, with terminal drainage unless a Master Drainage/Special <br /> Purpose Plan permits retention ponds. On-site drainage may e permitted in Rural <br /> Residential designations if parcels are two acres or more. <br /> The General Plan Policies Specific to Stockton in Volume II (p. X-12) of the General Plan <br /> state that vacant land in the Far East Side area (designated on Figure X.B-1) shall <br /> remain A-U zoning until urban services are available to support development. The <br /> proposed project is included in the Far East Side area referenced above. Urban <br /> development shall only occur when adequate public services (including public water <br /> supply, sewerage, and terminal drainage) exist or are provided to satisfy the needs of <br /> the project. Development Title Section 9-1100.1(d)(1) states that applications for <br /> development projects or zone reclassifications shall be accepted only if the developer <br /> provides a written statement to the County from the agency expected to provide any <br /> required service that the agency will serve the proposed development project and has, <br /> or will have the capacity to provide such services at the time of development. As a <br /> result, if a full application is submitted, the applicant will be required to submit a "will- <br /> serve" letter from the East Stockton Sewer District and from the California Water Service <br /> stating that public sewer and water services are available for the project. The will-serve <br /> letters must be submitted with the Zone Reclassification application. The Department of <br /> Public Works has stated that storm drainage services are available in the project vicinity. <br /> 2 <br />