My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006159
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOSSDALE
>
640
>
2600 - Land Use Program
>
PA-0600418
>
SU0006159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:11 AM
Creation date
9/6/2019 10:16:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006159
PE
2605
FACILITY_NAME
PA-0600418
STREET_NUMBER
640
Direction
W
STREET_NAME
MOSSDALE
STREET_TYPE
RD
City
LATHROP
APN
23903009 04 07
ENTERED_DATE
8/1/2006 12:00:00 AM
SITE_LOCATION
640 W MOSSDALE RD
RECEIVED_DATE
8/1/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MOSSDALE\640\PA-0600418\SU0006159\APPL.PDF \MIGRATIONS\M\MOSSDALE\640\PA-0600418\SU0006159\CDD OK.PDF \MIGRATIONS\M\MOSSDALE\640\PA-0600418\SU0006159\EH COND.PDF \MIGRATIONS\M\MOSSDALE\640\PA-0600418\SU0006159\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(C) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a <br /> qualified civil/geotechnical engineer based upon site-specific geologic conditions; <br /> n. FENCING: Fencing four(4)feet in height consisting of not less than three(3)strands of barbed wire, <br /> or an approved equivalent, shall be placed around the excavation area where slopes steeper than <br /> two (2) feet horizontal to one (1) foot vertical are maintained. Six (6)foot high security fencing or an <br /> approved equivalent shall be required where slopes steeper than two (2) feet horizontal to one (1) <br /> foot vertical are created, if the proximity of such slopes to residential uses or other uses involving a <br /> concentration of people so warrants. (Development Title Section 9-1415.3[1]) <br /> o. EXCAVATION/RECLAMATION SCHEDULE: The reclamation plan shall show the phases of <br /> excavation. Reclamation on one phase of an excavation shall be initiated prior to the start of the next <br /> excavation phase. The final reclamation of any phase of excavation shall be completed within two <br /> years of the commencement of the reclamation process. Excavation shall be limited so that at any <br /> point of time a maximum of one phase is being reclaimed while one phase is being excavated. <br /> (Development Title Section 9-1415.3[0]) <br /> p. TIME LIMITATION: The Quarry Excavation Permit shall expire four (4) years from the date of <br /> approval. <br /> q. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br /> may use professional services as provided for in Section 9-240.11. The consultant shall be selected <br /> by San Joaquin County. Upon completion of the annual inspection, the person in charge of the <br /> mining operation shall submit to the State Geologist and the County a report which shall contain all <br /> the information as required by Section 2207 of the Public Resources Code. The cost of the <br /> inspection shall be paid by the mine operator. Additional inspections may be conducted, but the cost <br /> of additional inspections shall be paid for by the mine operator only if non-compliance with the <br /> conditions of the Quarry Excavation Permit or the reclamation plan is found. (Development Title <br /> Section 9-1415.3[q]) <br /> r. PERFORMANCE GUARANTEE: In order to ensure reclamation of the site, compliance with <br /> conditions of approval, and compliance with County and state mining regulations, the applicant shall <br /> provide performance guarantees as a condition of the issuance of the Quarry Excavation Permit. <br /> The amount and form of the guarantee shall be subject to annual review and approval by the County <br /> and the state, and the amount shall be adequate to ensure reclamation of disturbed land and/or land <br /> to be disturbed during a given phase. The annual review of the financial guarantee shall be <br /> coordinated with the annual inspection and approval of successive reclamation security so that the <br /> guarantee includes the amount of disturbed land plus the amount of land estimated to be disturbed <br /> during the next 12 months, less the amount of land previously determined by Development Services <br /> Division annual inspection to have been reclaimed. The performance guarantee shall be in the form <br /> of either: 1) a surety bond, 2) a trust fund with the lead agency, or 3) an irrevocable letter of credit. <br /> Any interest accrued in a trust fund shall stay with the trust fund account. The financial guarantee <br /> shall be payable to "San Joaquin County or the Department of Conservation" under the applicable <br /> provisions of the County and the state mining regulations. The financial guarantee shall be callable <br /> by the County or the State under the following circumstances: <br /> (1) The applicant causes the excavation to become idle (as defined in Section 9-110 of the <br /> Development Title)without an approved interim management plan; <br /> (2) The applicant files for bankruptcy; <br /> (3) The County or State determines on the basis of annual inspections and reports that the applicant <br /> has not maintained substantial compliance with the approved Permit, <br /> Conditions of Approval - 3 - PA-0600418 <br />
The URL can be used to link to this page
Your browser does not support the video tag.