Laserfiche WebLink
1 Implementation Responsibility—This column identifies the entity responsible for complying <br /> with the requirements of the mitigation measure. In most cases, the construction contractor <br /> 1 will be responsible for conforming with the mitigation measure. <br /> Implementation and Verification—These columns are for verifying compliance.The "Action" <br /> column describes the type of action taken to verify implementation. The "Date Completed" <br /> 1 column is to be dated and initialed by the project manager, or his/her designee,based on the <br /> documentation provided by the construction contractor, its agents (qualified individuals), or <br /> through personal verification by San Joaquin County. <br /> t <br /> t <br /> J <br /> College Pork at Mountain House Specific Plan III EDAW <br /> San Joaquin County 3 Mitigation Monitoring and Reporting Program <br />