Laserfiche WebLink
3 G <br /> a <br /> o � <br /> College Park at Mountain House Specific Plan III <br /> s Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation Implementation&Verification <br /> e Responsibility Action Date Completed <br /> a 4.2 LAND USE <br /> 0 4.2.1 Land Use and Agriculture—Conflict with Before and during San Joaquin <br /> m Existing Land Uses construction, and County,the <br /> The College Park developers shall implement During design developer, in <br /> o the following measures: phase coordination with <br /> a Fence off the two on-site Byron-Bethany BBID <br /> Irrigation District (BBID) canals from - <br /> proposed urban development until such <br /> time as the canals are filled.The fencing <br /> shall be sufficient to block access to the <br /> canals by all except BBID personnel and <br /> a other authorized persons, and shall be <br /> developed in coordination with BBID to <br /> ensure that BBID has continued access to <br /> the canals for maintenance activities. <br /> Implement Mitigation Measure 4.9-5, <br /> identified in Section 4.9, "Public Health and <br /> Safety," to ensure that the proposed <br /> oresidences are not exposed to an explosion <br /> ;r hazard from the natural gas pipelines within <br /> 3 the PG&E–Chevron easement that bisects <br /> S the project site. <br /> e Identify an agricultural buffer of no less <br /> N c than 100 feet at the time of Tentative Map <br /> approval for any new units in the residential <br /> g`g area in and south of Grant Line Village and <br /> =' adjacent to the County line. <br /> -o <br /> 0 0 <br /> c � <br /> -_.. - ,�. r.r. ��. i►+� +.+� (�� „vim' ^�1 r.�i ��+ �*n, }rte �� �-�� I`� rte. ...�. �� <br />