3 r^ <br /> a <br /> o � <br /> College Park at Mountain House Specific Plan III <br /> o Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing(Schedule Implementation Implementation&Verification <br /> o Responsibility Action Dote Completed <br /> Aequipment operation; <br /> c Identify measures to prevent or clean up <br /> spills of hazardous materials used for <br /> equipment operation and hazardous waste; <br /> Identify emergency procedures for <br /> 0 <br /> 3 responding to spills; <br /> Identify BMPs that shall be used in all <br /> subsequent site-development activities; <br /> Identify personnel training requirements <br /> and procedures that will be used to ensure <br /> that workers are aware of permit <br /> o requirements and proper installation and <br /> performance inspection methods for <br /> specified BMPs; <br /> Identify the appropriate personnel <br /> responsible for supervisory duties related to <br /> implementation of the SWPPP; and <br /> Require all construction contractors to <br /> -9 <br /> retain a copy of the approved SWPPP on <br /> the construction site. <br /> 3 4.9 PUBLIC HEALTH AND SAFETY <br /> 4.9.1 Public Health and Safety—Possible Exposure Before and during San Joaquin County <br /> to Pre-Existing Hazardous Materials During construction; and the developer, <br /> Construction Before demolition, in conjunction with <br /> NThe College Park developers shall implement renovation, or a qualified <br /> a the following measures! modification of hazardous materials <br /> Project grading, excavation, and other earth- structures expert <br /> moving activities at the project site and off- <br /> 5 site infrastructure locations shall be <br />